Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3112)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13408)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2381)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (421)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2390)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1201)
Question
how much quantity of tile placing can be finished by one mason 
per day?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
160 to 180 Sft/mason/day 
Is This Answer Correct ?    9 Yes 3 No
Yaswanth Kumar
 
Answer
# 2
200-225 sft / day per mason 
Is This Answer Correct ?    6 Yes 2 No
Vipul Tank
 
 
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
how quantity of much blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork L&T 2
types of piles?   4
If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?   5
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge   2
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl   1
what are the various types of pile foundation? explain with introduction   5
How do you determine or evaluate success? Essar 5
RCC MEANS   6
what is gunter's chainm. what is yhe number of links in chain. and 1 link shows what distance   1
what is the grade of concrete?   3
what is the name of software for designing of R.C.C.structures   9
How can u prepare mix design for concrete? L&T 2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   