ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3157)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3309)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13491)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2396)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (424)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2409)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (109)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (39)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (82)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1211)
Question
how much quantity of tile placing can be finished by one mason 
per day?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
160 to 180 Sft/mason/day 
Is This Answer Correct ?    11 Yes 3 No
Yaswanth Kumar
 
Answer
# 2
200-225 sft / day per mason 
Is This Answer Correct ?    6 Yes 3 No
Vipul Tank
 
 
 
Answer
# 3
DEPENDS UPON THE SIZE OF TILE IT MAY VARY. 
Is This Answer Correct ?    0 Yes 0 No
Thanveer Kanniyan
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
hi , can anybody help me about the following doubt...... what is the difference between clear cover, cover and nominal cover to reinforcement ?   3
How to find the volume of wood(tree) from its height and circumference.(circumference-6'5" and height 3'2")??   1
Rigid pavement Load in tyre preesure It Means KG L&T 2
What are the advantages of Prestressed Concrete   4
1.(a.) how do you calculate the volume of mortar for 1 piece of block 450mm x 225mm x 225mm. (b.) calculate for 1sqm   1
Wat are the elements consider in the shuttering load design calculation   1
Slow setting admixture is used in mass concrete because of Reliance 4
how many bricks in 1 one cubic meter?   2
difference between high way pavement and local road? L&T 8
what is mean by bond strength?   1
How do you calculate the mix ratio of concrete i.e. what is the cement:sand:agrugate ratio in 20Mpa, 21Mpa, 22Mpa etc...   2
How many no of cement bags required to do the concrete with the proportions 1:1.5:3 for 4inch thickness for 100 sqft?   3
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com