ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3147)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3304)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13469)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2392)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (423)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2407)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (81)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1204)
Question
what is the ingrediants of wet mix macadam?construction 
procedure?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
40MM -35%,20MM -20%,10MM 20%Stone dust 25% 
Is This Answer Correct ?    32 Yes 6 No
Umesh Vishnu Patankar
 
Answer
# 2
Wet mix is a blended form of road base having nominal size
of aggregate less than 37.5mm. It has high CBR value and
maximum dry density (normally greater than 2.4kg/m3).
 
Is This Answer Correct ?    20 Yes 17 No
Joseph
 
 
 
Answer
# 3
2300 to 2400kg/cum 
Is This Answer Correct ?    2 Yes 0 No
Prabhu B
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
specific gravity of block cotten soil, normal, rockysteta   1
WHY IS COVER PROVIDED IN BEAMS, SLABS, LINTELS, COLUMNS, etc ? WHAT IS THE DRAWBACK OF NOT PROVIDING COVER IN THE SAME?   8
9*9m 1:4:8 ratio using what quantity of 40mm aggregate, sand&cement please tell anwser L&T 3
When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How to know at a glance it is complete in order, do have any one checklist format in this regard. JMD-Group 1
how 2 find out slap steel quantity ? plz help me NCC 1
what is the weight of wet concrete? ABB 7
HOW MUCH LAP LENGTH PROVIDED IN COMPRESSION AND TENSION IN BRIDGES?   2
how to identify different types of soils in field?   2
what do you mean by fe500d what is 500 n what's ,d,   3
Water absorption for stone?   6
how to calculate slab reinforcement c/c spacing bars and how calculate minuam slab basic slab & roof beams reinforcement design   1
how many kg sand is requried for plastring in 100 sqft? L&T 3
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com