ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3113)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13416)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2382)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2393)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1202)
Question
a)If column dimensions are 250*400mm , what will be  
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab 
cover is 20mm , what will be the cutting length for 
stirrups? c)Column dimensions are 250*400mm , reinf. is 
12nos. bar of 16mm dia , stirrups provided are two legged, 
what will be the length of each ring?

Regards
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
1) let cover for column be 40mm (as u have not mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN-2XCOVER=400-40X2=320MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-40X2=170MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X320+2X170 + 24X8 =1172MM=1.172 meter
2) given cover 25mm (as u have mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF BEAM-2XCOVER=400-25X2=350MM
B=SHORTER LENGTH OF BEAM-2XCOVER=200-25X2=150MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X350+2X150 + 24X8 =1192MM=1.192 meter

NOTE SLAB COVER HAS NOTHING TO DO WITH CAL.OF STIRRUPS
3) ASSUME cover 30mm (as u have NOT mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN/2 -COVER=400/2-30=170MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-30X2=190MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X170+2X190 + 24X8 =912MM=0.912 meter EACH

NOTE I HAVE CONSIDERED 8MM DIA STIRRUP BAR EVERY WHERE
UPTO 12MM DIA BARS CAN BE USED AS STIRRUPS GENERALLY
i am a civil engineer. if u r a civil engineer i think u should
by a bookits name is

estimation and costing by B.N.DUTTA u will get alot of
information through this book ....i think no one has been able
to explain the correct method ....good luck
 
Is This Answer Correct ?    86 Yes 11 No
Santosh Singh
 
Answer
# 2
a) let the cover 40 mm.in column,then
cutting length of ring is= 2*(170+320)+2*10*d-10*d
where hooks are= 10d+10d
deduction bend=2*5*d=10d
so length is =1060 mm
 
Is This Answer Correct ?    10 Yes 3 No
Md Gyasuddin Ahsan
 
 
 
Answer
# 3
Can any other one help,please. 
Is This Answer Correct ?    17 Yes 14 No
Rohit_rangnekar1975
 
Answer
# 4
If Cutting length of ring is 250-40*2=170
400-40*2=320
Total =170+320*2=980mm+hook calculate 10*8+80
We elongation on the 8mm rod
minus =980+96+96=1172-5*8
1172-40=1132 mm
 
Is This Answer Correct ?    5 Yes 2 No
Jaikumar
 
Answer
# 5
IN CASE OF COLUMN-
DIM.-200X400mm
CONCRETE COVER-
FOR COLUMN THICKNESS <250mm=25mm
FOR COLUMN THICKNESS >250mm=40mm

LENGHT OF TIE- 2A+2B=2X200+2X400=1200mm

NOW DEDUCT CONCRETE COVER-LENGTH OF TIE-COCNRETE COVER=1200-
2X40=1120MM

ALSO, DEDCUT BENDS- 2D FOR 45degrees
D FOR 90degrees

THEREFORE- CUT LENGTH OF TIE-1120-DX5=1120-2X8=1104mm(NO.
OF BENDS -5 )
Length of Hooks=10d=10x8=80MM
NO. OF hooks=2
Therefore-Length of Hook=2x20=160MM

CUTTING LENGHT OF BAR=1104+160=1264MM=1.264m
 
Is This Answer Correct ?    3 Yes 0 No
Shashank
 
Answer
# 6
wrong all answer 
Is This Answer Correct ?    1 Yes 0 No
Bitoy
 
Answer
# 7
For This cutting length will be
2x170+2x320-4x2d+9d
340+640-64+72=988
 
Is This Answer Correct ?    2 Yes 1 No
Rajeev
 
Answer
# 8
a) Column size= 250*400,
so, L=250, B=400, cover = 40mm, bar dia 8mm
Cutting length of stirrups
= 2(L+B)-(8*cover)+(2*10d)-(1.5d*nos of bends)

(2*10d) is for 2hooks,
1.5d is deduction for elongation at each bend

Calculation =2*(250+400)-(8*40)+(2*10*8)-(1.5*8*5)
Cut length= 1080 mm.
 
Is This Answer Correct ?    2 Yes 1 No
Manish
 
Answer
# 9
a) let the cover 40 mm.in column,then
cutting length of ring is= 2*(170+320)+24*d-10*d+5*d
where hooks are= 12d+12d
deduction bend=2*5*d=10d
add 5 times of one dia of bar
so length is =1132mm.
 
Is This Answer Correct ?    13 Yes 13 No
Er. Manoj Baisla
 
Answer
# 10
A)CUTTING LENGTH FOR 8mm Strips=2(250+400-2*80+2*10*8-2*5*8)
=1140+160-80
=1280 mm
 
Is This Answer Correct ?    0 Yes 0 No
Pravin K
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
how is shear resisted in a structure?   2
How much quantity of coping is done per day by one mason in Rmtr?   2
how many bags of cement required in neat cement finish per square metre   2
what is the code for classification of bricks   2
If concrete fails in cube strength as well as non distactive test? what to do? for example grade of concrete is M35, cube strength is 26.1 n/mm2 after 28 days and non districtive test strength is 28.1 n/mm2 after 28 days. i am not distroying the rcc memeber.   2
What is the finess modulus of sand?   18
what is the formula to calculate isolated footing   6
WHAT IS THE DIFFERENCE BETWEEN FACTOR OF SAFETY AND PARTIAL SAFETY FACTOR?   1
How to calculate cement and sand quantities in cement mortar As 1:1,1:2,1:4,1:6 ? Simplex 15
What are the grade of steel used in the concrete design.? Engineers-India-Limited 7
how to calculate the stirrup bend length?is there any formula?   3
how do understand the plinth beam croos section diagram   1
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com