ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3114)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13420)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2382)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2393)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1202)
Question
how much the volume of one packet cement ?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
1 bag of Cement Contains 50Kg
in 1 cum required cemnt is 1440kg
since,Volume of one Cement bag = 50/1440 = 0.035m3
:1 bag = 0.035m3 volume
 
Is This Answer Correct ?    14 Yes 3 No
Jayaraaj
 
Answer
# 2
1 bag of Cement Contains 50Kg
If Freshly packed cement bag the standard density is 94
lbs/ft3 (1505 kg/m3)
Volume of one Cement bag = 50/1505 = 0.0332m3
:1 bag = 0.0332m3 volume
 
Is This Answer Correct ?    17 Yes 7 No
Hema Morampudi
 
 
 
Answer
# 3
1.25 cft 
Is This Answer Correct ?    1 Yes 0 No
Muthaa
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum Arma-Group 3
what type of qustions can i expect from soil mechanics HPCL 1
how much cement is required for 100 sft plastering of ratio 1:4 Confident-Group 5
As an engineer, what u should do when the construction of a building doesn't meet the required specifications?   9
why primer application is required before applying putty Ramky 3
WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP   2
Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??   1
What is the lap length in your project? L&T 10
Do you know differenence between design mix and nominal mix? L&T 7
what"s the formula to calculate the water for M15 grade concrete?   4
why red bricks used for brickbat coba   1
MEANING OF M20 AND M200 CONCRETE   7
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com