ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3151)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3304)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13476)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2395)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (424)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2407)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (111)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (81)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1205)
Question
which"s we should use for concrete ppc or opc?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Both OPC & ppc are used in concrete. 
Is This Answer Correct ?    9 Yes 1 No
Nakkeeran.raja
 
Answer
# 2
ordinary port land cement 
Is This Answer Correct ?    11 Yes 4 No
Pandiyan
 
 
 
Answer
# 3
ppc or pozzolana portland has low heat of hydration as
compared , it produces less cracks on setting than opc or
ordinary portland cement . ppc is thus preferred
 
Is This Answer Correct ?    4 Yes 0 No
Aditya Richie
 
Answer
# 4
OPC cement is used for concreting works as PPC contains
admixtures which will prolong the setting of cement concrete
than its setting times.
 
Is This Answer Correct ?    4 Yes 0 No
Mohammed Aijaz Hussain
 
Answer
# 5
ppc; pozallan portland cement

opc;ordinary portland cement
 
Is This Answer Correct ?    5 Yes 4 No
Srinu.s
 
Answer
# 6
ppc-portland pozzolana cement
opc-Ordinary pozzolana cement
 
Is This Answer Correct ?    5 Yes 4 No
Punyaram
 
Answer
# 7
Both OPC & ppc are used in concrete.but the usage depends on the strength of the concrete that we should achieve. Generally for low strength concrete that is up to 25Kn/ m2 we use ppc and higher the concrete strength we use OPC 
Is This Answer Correct ?    3 Yes 3 No
Ramakrishna
 
Answer
# 8
OPC is used for Concrete structure/also for masonry works
also/ But PPc can only used for Masonry works not fit to
use concrete structures. PPC is low heat of hydration no 1
for block/brick works/plastering/flooring works.
 
Is This Answer Correct ?    4 Yes 5 No
Tanuja
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
In case of tunnels (Railway) what is the way of securing a wall beam? L&T 1
which is cover of r.c.c. column,beam and slab   4
what is the formula for lapping length   5
what is plum & mass concrete?   4
Cement , sand , concrete ration in M30 Grade ADITI 1
How much shuttering oil required for per m2 shuttering by 12mm ply   1
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above   1
What is the maximum cement content allowed in RCC? L&T 10
1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?   1
what is the meaning of M & 20   4
Instead of sand blasting is there any method to clean the rust of steel ??? L&T 2
how lap length is increased with increase of Grade of steel?   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com