ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3151)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3304)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13475)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2394)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (423)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2407)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (108)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (81)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1205)
Question
how many days we should curing for 
plastering,brickwork,concrete?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
 
Is This Answer Correct ?    61 Yes 1 No
Senthil Kumar P
 
Answer
# 2
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
 
Is This Answer Correct ?    51 Yes 7 No
Jai.vignesh
 
 
 
Answer
# 3
7day min 
Is This Answer Correct ?    23 Yes 2 No
S
 
Answer
# 4
7 Day for Brickwork and Plastering
14 Days for Concrete
 
Is This Answer Correct ?    9 Yes 0 No
Ganesh Mapari
 
Answer
# 5
minimum 7days 
Is This Answer Correct ?    7 Yes 1 No
Venkataratnam.y
 
Answer
# 6
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
 
Is This Answer Correct ?    8 Yes 5 No
Udaya
 
Answer
# 7
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
 
Is This Answer Correct ?    3 Yes 0 No
Ram Mohan Rai
 
Answer
# 8
concrete need min 7 days contineous curing 
Is This Answer Correct ?    1 Yes 0 No
Engr.sameer
 
Answer
# 9
28 days. 
Is This Answer Correct ?    13 Yes 15 No
Naveen
 
Answer
# 10
This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete
 
Is This Answer Correct ?    1 Yes 4 No
Muraliyadav
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
Approximate weight of a modular brick?   1
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?   1
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..   6
Ratio of cement : sand for fixing slab and tiles in the floor and also quantity of cement and sand requires for laying slab and tiles separately (area 100 sq. ft) DLF 1
TWO EXAMPLES OF NET WORT REVENUES FROM BUILDING CONSTRUCTION   1
Unit weight of brick? Sand? Aggregate? Steel? Cement? Water? Aliens-Group 17
What is difference between nominal mix and design mix?   8
How can we cross check the excavation and backfilling quantities.   3
1cracks found in brick wall in service building, how to rectify it,with low cost ? how to find propagation of cracks (in depthwise) and arrest on that stage? Is it require to design for Expansion joint in Brick work? if so what is the required distaces?   1
mix design concrete m30 for elevated water tank SITM 2
what is mean by super structure?   24
what is the bend correction for 90 degree of bend in any dia of HYSD steel reinforcement as per IS code ?   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com