Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3009)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3270)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13218)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2348)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (407)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (76)
 Bio Engineering interview questions  Bio Engineering Interview Questions (16)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (162)
 Instrumentation interview questions  Instrumentation Interview Questions (2315)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (104)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (73)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1189)
Question
how many days we should curing for 
plastering,brickwork,concrete?
 Question Submitted By :: Geethu
I also faced this Question!!     Rank Answer Posted By  
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 1
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
 
Is This Answer Correct ?    48 Yes 5 No
Jai.vignesh
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 2
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
 
Is This Answer Correct ?    58 Yes 1 No
Senthil Kumar P
 
 
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 3
7day min 
Is This Answer Correct ?    20 Yes 1 No
S
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 4
28 days. 
Is This Answer Correct ?    12 Yes 14 No
Naveen
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 5
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
 
Is This Answer Correct ?    6 Yes 5 No
Udaya
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 6
minimum 7days 
Is This Answer Correct ?    4 Yes 1 No
Venkataratnam.y
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 7
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
 
Is This Answer Correct ?    2 Yes 0 No
Ram Mohan Rai
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 8
concrete need min 7 days contineous curing 
Is This Answer Correct ?    1 Yes 0 No
Engr.sameer
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 9
7 Day for Brickwork and Plastering
14 Days for Concrete
 
Is This Answer Correct ?    3 Yes 0 No
Ganesh Mapari
 
  Re: how many days we should curing for plastering,brickwork,concrete?
Answer
# 10
This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete
 
Is This Answer Correct ?    0 Yes 2 No
Muraliyadav
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?   1
How to defind P.C.C. mix design according ratio & IS coad ITC-Infotech 10
what is the diffrence of opc and ppc cement ? expailn   5
where should the lap of a beam should be   1
What is water/cement ratio? Importance in construction?   1
while doing floring in a room,from where one can start laying tiles.   8
what is mean by short coloumn? it is depend on the height? or dia of coloumn.?   7
How many different between estimated quantity and practical work at site.   1
Tell me about Construction, Contraction and Expansion joints... Modi-Builders 1
As an engineer, what u should do when the construction of a building doesn't meet the required specifications?   9
how many type of pipe using in plumbing? Tulip 2
what is bending moment?   4
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   