Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3120)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3300)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13434)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2398)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (80)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
how many days we should curing for 
plastering,brickwork,concrete?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
 
Is This Answer Correct ?    61 Yes 1 No
Senthil Kumar P
 
Answer
# 2
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
 
Is This Answer Correct ?    51 Yes 7 No
Jai.vignesh
 
 
 
Answer
# 3
7day min 
Is This Answer Correct ?    22 Yes 2 No
S
 
Answer
# 4
7 Day for Brickwork and Plastering
14 Days for Concrete
 
Is This Answer Correct ?    7 Yes 0 No
Ganesh Mapari
 
Answer
# 5
minimum 7days 
Is This Answer Correct ?    6 Yes 1 No
Venkataratnam.y
 
Answer
# 6
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
 
Is This Answer Correct ?    7 Yes 5 No
Udaya
 
Answer
# 7
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
 
Is This Answer Correct ?    2 Yes 0 No
Ram Mohan Rai
 
Answer
# 8
concrete need min 7 days contineous curing 
Is This Answer Correct ?    1 Yes 0 No
Engr.sameer
 
Answer
# 9
28 days. 
Is This Answer Correct ?    13 Yes 15 No
Naveen
 
Answer
# 10
This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete
 
Is This Answer Correct ?    1 Yes 4 No
Muraliyadav
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
give an example for cantilever structure   9
can we go for short rcc column without any steel rienfocement carrying truely axial load only???(No other load acting on it such as wind load,earthquake & lateral earth pressure) Lodha 2
what is the specific gravity of cement .define it and value?   1
what is difference between 33, 43 and 53 grade cement..? which is more suitable for construction and why,..??   1
what is difference between fe 415 and fe 500 CCCL 7
WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?   2
clear cover for concrete structures as per BS   4
what is specific gravity of soil?   9
how to calcalate for roof beams & slab reinforcement design specified?   1
why construction joint in the slab should be l/3 of span? what's the technical reason for that?   1
which member is very strong (strength) after the cross- section area is same, pipe section or solid rod section ? no that's not my question, my question is why pipe section is strong ?   2
how to calculate quantity of steel & concrete in stair case Orbit-Corporation 7
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   