ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3114)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13420)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2382)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2393)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1202)
Question
How is rate analysis prepared for M 25 grade of concrete?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Calculate the quantity of coarse aggregate + sand +cement +
method of placement + shuttering + method of curing
 
Is This Answer Correct ?    79 Yes 12 No
Pranav
 
Answer
# 2
calculate the coarse aggreate+cement+quality
expensis+considered traveling charges+electric power
charge+technical persons charge+shurtring+curing cost and
additional mixing cost.
 
Is This Answer Correct ?    11 Yes 1 No
G Pavan Kumar
 
 
 
Answer
# 3
calculate the concrete batching plant running cost,material
cost,shuttering cost,curing cost.
 
Is This Answer Correct ?    15 Yes 16 No
Fayyaz Tabussam
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
How do you find the difference between 53&43 grade cement in site?   6
what is scour depth $ what's the process to determine it?   1
how much binding wire required per tonne slab beam columns   4
How to know proportions of cement, sand, aggregate in different types of grades like M5, M10, M20, M30?   6
What is the density of steel?   6
Trapezoidal section footing calculation of Volume & its Area   8
1 cubicmeter liquid = how much litre   6
what will affect low density aggregates on concrete wt?   2
why breadth of beam is shorter than (or equal to )its depth?   7
how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)   3
How to calculate productivity of construction equipment like excavator, dozer, rock breaker, riper   2
What is the weight of std brick and 6" ,8",4" solid block...?   3
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com