ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3077)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3290)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13335)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2381)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (77)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
What is the mixing ratio of M7.5,m10,M30,m35&m40?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
M 7.5 - 1:4:8

M 10 - 1:3:6

M 30, 35 & 40 are design mix.
 
Is This Answer Correct ?    73 Yes 13 No
J R
 
Answer
# 2
M7.5 1:4:8(cement:fine:coarse)
M10(1:3:6)
M15(1:2:4)
M20(1:1.5:3)
M25(1:1:2)
M30,M35,M40,M45 are designed as per aggregate's
,water/cement ratio,type of sand and water are use..it is
designed as per design mix and there will be change in each
aspect....
 
Is This Answer Correct ?    40 Yes 2 No
Varun
 
 
 
Answer
# 3
m 10 - 1:3:6

m 10 - 1:3:6

m 30,35,40 are design mix
 
Is This Answer Correct ?    42 Yes 5 No
Cnu.143
 
Answer
# 4
FROM m25 ON WARDS ALL THE GRADE OF CONCRETES ARE DESIGN MIX 
Is This Answer Correct ?    32 Yes 0 No
Venkatesh
 
Answer
# 5
M7.5 (1:4:8)
M10 (1:3:6)
M15 (1:2:4)

M30 , M35 & M40 are Design mix
 
Is This Answer Correct ?    16 Yes 1 No
Venkat
 
Answer
# 6
M 7.5 - 1:4:8

M 10 - 1:3:6

M 30, 35 & 40 are design mix.
 
Is This Answer Correct ?    13 Yes 3 No
Prabhu
 
Answer
# 7
M5 = 1:5:10
M7.5 = 1:4:8
M10 = 1:3:6
M15 = 1:2:4
M20 = 1:1.5:3
M25 = 1:1:2

Best, A/c to my knowledge...
 
Is This Answer Correct ?    2 Yes 3 No
Mayur
 
Answer
# 8
M 7.5 = 1:5:10
M 10 = 1:4:8
M 15 = 1:3:6
M 20 = 1:2:4
M 25 = 1:1.5:3

(M25, M30, M35, M40, M45 all are mix designs).
 
Is This Answer Correct ?    17 Yes 69 No
Arun
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
how much steel required for 1 square meter slab? Lanco 5
WHAT IS THE MELTING POINT OF STEEL? Akshaya 1
what type pressure pipe use in sewerage & water supply? Tulip 1
22. Are you willing to attend trainings, learn new skills and develop as a professional?   2
i m searching for steel or rebar weight/meter (d)2/162 this is correct but why used here 162   3
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table   2
What is the accepted silt content in sand for concreting purpose by volume method?   9
How calculate the material in concrete mix in ratio 1:2:4 ?   3
WHEN BRICK SIZE IS 3X5X9" , WHAT WOULD BE THE NUMBER OF BRICK REQUIREMENT FOR 100 SQFT AREA OF 5" width?   6
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.   2
what is the real de-shuttering time for rcc column,slaband wall   3
What is Fly Ash & Admixture & What is the purpose of mixing Fly Ash & Admixture to Design Mix? Tell the name of commonly used Admixtures LCC 2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com