ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3120)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3299)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13431)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2398)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (79)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
How to repair the Pavement quality conc used for toll 
plazas if is giving hungry look or honeycombed ?
how much cement need to treat 100sqmtr of Damaged PQC
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Honey combed concrete repair by
1. Pressure grouting with Polymer cement slurry. than
2. Filled up surface with epoxy or polmer mortar and
levelled it.
3. or by laying of mastic of 20mm or more thick and compact
it
 
Is This Answer Correct ?    1 Yes 0 No
Pradeep
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
Why are we providing crank in beam? Thanks.   2
What is expansion joint   5
As a site engineer what do you check in foundation before concreting   3
what is a louer? and for which purpose it will be used. GMR 3
Why chairs are provided at slab? Kalpakkam 2
How to increse bearing capacity in soils (Stabilisation of soils)   10
how to calculate no. of cement bags consumed in 1:4 and 1:6 proportion RR Masonary and the quantity of sand also   2
Key is put at the time of casting 1st lift of column to get– –   1
why we always consider Bulkage due to the voids only for the Fine aggregates not for the Coarse aggregates   3
what is the unit of heat of hydration? L&T 3
which is code is used for design of steel structure Simplex 3
Rigid pavement Load in tyre preesure It Means KG L&T 2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright © 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com