Varioe stages of the Testing life cycles are:
Effort Estimation.
Project Initiation.
System study.
Test Plan.
Design Test cases.
Test Automation.
Execute Test Cases.
Report Defects.
Regression Test.
Analysis.
Summary Reports.
What given above are like sub modules under some modules.
So to say it in a structured way we can say it as:
1. Test Initiation.
2. Test Planning.
3. Test Design.
4. Test Execution.
5. Test Closure.
The stages in Testing life cycle
Test Plannig
Test Development
Preparation of test environment
Test Execution
Test Evaluvation
Defect Tracking
Doccumentation Preparation
The stages in Testing life cycle are:
Test Intiation
Test Planning
Test Design
Test Execution
Test Report
Regression Testing (This is conducted on modified build
when the bugs found in the existing build)
Test Execution closure.
The stages in Testing life cycle are:
Test Requirement
Test Planning
Test Environment setup
Test case design or contruction
Test Execution
Defect tracking
Regression Testing
Test Report
Test Closure
stages of testing life cycle.
1. test initiation it is performed by project manager.
2. test planning it is performed by test lead.
3. test design
4. test execution
5. test report ( regression testing ,re-testing)
6. test closure.
3,4,5,6 phases are purely taken care by testing
engineers.
1)Planning---Create high level test plan
2)Analysis---Create detailed test plan, Functional
Validation Matrix, test cases
3)Design ---test cases are revised; select which test cases
to automate
4)Construction---scripting of test cases to automate,
5)Testing cycles--complete testing cycles
6)Final testing--execute remaining stress and performance
tests, complete documentation
7)Post implementation---Evaluate testing processes
1. Establish Test Objective
2. Prepare test Plan
3. Design Test Cases
4. Review Test Cases
5. Execute the Tests
6. Prepare Test Reports
7. Examine Test Results
8. Preform Postmortem Review
Testing Methodology.
1. Test Initiation. (BRD,FSD,Test startegy)
2. Test Planning. (Test scenario, Test Case, RunPlan, Data
guidelines,Day Zero Check list)
3. Test Execution. (Execute the Testwares,Incident tracking)
4. Test Closure. (Test Exit Report, Archival activities)
eqivalance testing class is made from data and this is made
to minimize the test cases and it is black box testing what
at which particular time we do this testing i guess while
creating test cases we consider this testing .plz if lett
me know if i am wrong
Suppose " You are given a build with 5 modules to test as
per the Customer request after finalization of SRS, But the
SRS contains only documentation about 4 modules. On what
basis you will continue the testing of 5th module." ?