ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3119)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3299)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13431)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2394)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC 
METER.
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
For M20 Grade conc.

Head mason - .05 x Rs 200 = Rs 10.00
Mason - .3 x Rs 190 = Rs 57.00
Labour - 2.5 x Rs 90 = Rs 225
______________________________________
Total amount - Rs 292.00

Add 1% for watering

This is the only Labour cost of RCC not Machinary and
pouring
 
Is This Answer Correct ?    34 Yes 9 No
Sjtbehera
 
Answer
# 2
.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor
 
Is This Answer Correct ?    18 Yes 7 No
Naresh
 
 
 
Answer
# 3
for the rates of all labours, masssons etc we have to check
the rates from the schedule of retes of that area
 
Is This Answer Correct ?    7 Yes 1 No
Dushyant Bansal
 
Answer
# 4
0.5 masons means
half mason charge of the day/shift
same like supervison charges
 
Is This Answer Correct ?    4 Yes 1 No
Santhoshselvamani
 
Answer
# 5
Please tell me How many Cum can do a mason. if you know
then .05 can easily you can find, are you a civil engineer
 
Is This Answer Correct ?    9 Yes 7 No
Sjtbehera
 
Answer
# 6
can u explain ? Head mason - .05 x Rs 200 = Rs 10.00
Mason - .3 x Rs 190 = Rs 57.00
Labour - 2.5 x Rs 90 = Rs 225 ? wht"s mean by 0.05?
 
Is This Answer Correct ?    12 Yes 12 No
Geethu
 
Answer
# 7
YES 
Is This Answer Correct ?    1 Yes 1 No
Rocky
 
Answer
# 8
Mistry I No 0.200

Beldar Nos 3.000

Bhisti No 0.900
Sundries L.S 5.500
 
Is This Answer Correct ?    3 Yes 6 No
Praman Kr Srivastava
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what is drainage system?   8
how can we find out the ratio of cement and sand in plastering   2
how tl calculate lap lengh of concrete in different grade of concrete.   3
reinforcement lapping for short pile and long pile   2
In a slab where does the Uniformly Distributed Load (UDL) act? Crescent 6
IF X = Cement ,Fine Aggregate & Coarse Aggregate are in taken in weights for batching. Y= Cement , Fine Aggregate & Coarse Aggregate are taken in volume for batching. Then what will be the relation between X and Y?   2
how much binding wire is required for one tone steel Jindal 14
Laboratory experiments conducted in Mumbai on a particular mix showed a strength of 33 MP a for a fully matured concrete. Find whether formworm can be removed for an identical concrete placed at Jammu at the age of 15 days when the average temperature is 60C. The stripping stress in concrete CCIL 2
how can we calculate the amount of concrete in trapezoidal footing?   3
what is isoseismal?   1
how to distinguish TMT n Tor steel?   2
What are types of mixs ? L&T 3
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com