ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3072)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3287)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13323)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2364)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2375)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (75)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1195)
Question
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC 
METER.
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
For M20 Grade conc.

Head mason - .05 x Rs 200 = Rs 10.00
Mason - .3 x Rs 190 = Rs 57.00
Labour - 2.5 x Rs 90 = Rs 225
______________________________________
Total amount - Rs 292.00

Add 1% for watering

This is the only Labour cost of RCC not Machinary and
pouring
 
Is This Answer Correct ?    34 Yes 9 No
Sjtbehera
 
Answer
# 2
.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor
 
Is This Answer Correct ?    18 Yes 7 No
Naresh
 
 
 
Answer
# 3
for the rates of all labours, masssons etc we have to check
the rates from the schedule of retes of that area
 
Is This Answer Correct ?    7 Yes 1 No
Dushyant Bansal
 
Answer
# 4
0.5 masons means
half mason charge of the day/shift
same like supervison charges
 
Is This Answer Correct ?    4 Yes 1 No
Santhoshselvamani
 
Answer
# 5
Please tell me How many Cum can do a mason. if you know
then .05 can easily you can find, are you a civil engineer
 
Is This Answer Correct ?    8 Yes 7 No
Sjtbehera
 
Answer
# 6
can u explain ? Head mason - .05 x Rs 200 = Rs 10.00
Mason - .3 x Rs 190 = Rs 57.00
Labour - 2.5 x Rs 90 = Rs 225 ? wht"s mean by 0.05?
 
Is This Answer Correct ?    12 Yes 12 No
Geethu
 
Answer
# 7
YES 
Is This Answer Correct ?    1 Yes 1 No
Rocky
 
Answer
# 8
Mistry I No 0.200

Beldar Nos 3.000

Bhisti No 0.900
Sundries L.S 5.500
 
Is This Answer Correct ?    3 Yes 6 No
Praman Kr Srivastava
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
which concrete grade has highest strenth and what is its comosition? UltraTech 11
What is difference between FE-415 and FE-500??? Enercon 2
What all are important things keep in mind while designing and executing the water storage tank works?   1
in m45 what does m and 45 refers   4
how much lap we should provide in columns for Fe-500?   8
what"s the formula to calculate the water for M15 grade concrete?   3
What is green building?   13
how to calculate the steel quantity for beams & columns also footing net? what is the formulae for calculate the steel quantity? what is mean by (100.3)plinth level?what is mean by 100.3? explained it?   2
Clarify the out turn of steel fixer in construction field   1
what is mean by super structure?   23
what is the proedure to do soundness test in cement? What is the maening of soundness? Why we do it for cement?   1
What is minimum tensile strength required for structural steel works ?   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com