ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3077)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3289)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13333)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2381)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (77)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
weight rcc m30
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
2500Kg/m3 
Is This Answer Correct ?    25 Yes 2 No
M Krupa Varam
 
Answer
# 2
2.5 tonnes/cum 
Is This Answer Correct ?    8 Yes 1 No
N.rajeev D.c.e
 
 
 
Answer
# 3
25kN/m3 
Is This Answer Correct ?    4 Yes 2 No
Kalam
 
Answer
# 4
2400kg/m3 
Is This Answer Correct ?    5 Yes 6 No
Naresh
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
Which pavement is advisable in India?(Flexible or Rigid)   6
why steel is used in rcc columns? what is its purpose?   3
how many bricks,cement,sand of a 40*30*6 ft bowndry wall? NGO 4
a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to calculate it? b) If beam dimensions are 200*400mm , beam coveris 25mm , slab cover is 20mm , what will be the cutting length for stirrups? c)Column dimensions are 250*400mm , reinf. is 12nos. bar of 16mm dia , stirrups provided are two legged, what will be the length of each ring? Regards Speco 19
How Calculate Lap Length   5
in steel bar weight formula (d^2/162).so what is 162. PLEASE ANY ONE EXPLORED THIS METER . KPTL 4
WHAT IS THE DIFFERENCE BETWEEN "WORKING STRESS METHOD" AND "LIMIT STATE METHOD"? TCE 11
What is labour ratio for construction of residential buildings   1
why there is need to provide shear reinforcement?give the basic reason? Power-Grid 7
What should be the size (Cubic meter) of a water tank for 1000 Ltrs. capacity?   7
What are the specification of good quality sand for plaster and brickwork?   2
IF X = Cement ,Fine Aggregate & Coarse Aggregate are in taken in weights for batching. Y= Cement , Fine Aggregate & Coarse Aggregate are taken in volume for batching. Then what will be the relation between X and Y?   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com