 Civil Engineering interview questions  Civil Engineering Interview Questions (3083)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3292)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13342)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2383)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
How to calculate the amount of cement & sand required for 
plastering work with ratio 1:4 please give me an answer with 
detailed step.
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Area to be plastered=100 m^2
Thickness of plaster=12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+4=5
For 12mm plastering in 1:4 cement :sand mortar mix:

1)Cement required= 1.92/5= 0.384 cu. m
No. of bags of cement= 0.384/0.0347=11.06 bags

>> 11 bags(say)
Cement used =11 x 50= 550 kg

2)Sand required= [1.92 x (4/5)]= 1.536 cu. m

Important note:
[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347

Hope u have understood!!!!
 
Is This Answer Correct ?    213 Yes 20 No
Rajarshi Basu
 
Answer
# 2
THE METHOD GIVEN BY Mr.BASU IS SEEMS TO BE APPROPRIATE TO ESTIMATE THE QUANTITY OF CEMENT AND SAND IN PLASTERING. 
Is This Answer Correct ?    30 Yes 11 No
Matrix Civil & Structural
 
 
 
Answer
# 3
Area to be plastered=100 m^2
Thickness of plaster=12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3
Summation of proportion=1+4=5
For 12mm plastering in 1:4 cement :sand mortar mix:

1)Cement required= 1.92/5= 0.384 cu. m
No. of bags of cement= 0.384/0.0347=11.06 bags

>> 11 bags(say)
Cement used =11 x 50= 550 kg

2)Sand required= [1.92 x (4/5)]= 1.536 cu. m

Important note:
[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347
 
Is This Answer Correct ?    9 Yes 2 No
Shalini Mishra
 
Answer
# 4
Yes this formula is near abovet is correct 
Is This Answer Correct ?    8 Yes 2 No
Baldeo M. Sarwe
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38   1
Can fly ash bricks can be used in brick bat coba?   1
Difference between overlap and development length of rod. Thanks.   2
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?   1
How do you calculate the mix ratio of concrete i.e. what is the cement:sand:agrugate ratio in 20Mpa, 21Mpa, 22Mpa etc...   2
if water absorption is more than 25 percent in brick, what is the defect in it?   3
what is bond strength of concrete   1
In structural steel work what should be the wastage percentage considered to order the material( 200x200x5mm box section) in standard available sizes in India i.e. 6 mtrs?   3
the minimum percentage of steel for 2m rcc slab L&T 5
How many No of 4" Bricks Get consumed in 9" thick BB Masonary Wall of 1 cu.m.?   2
what is the difference between factor of safety and partial safety factor.?? NTPC 2
the capacity of water tank in liters if the diameter is 3m, and maximum height of water level as 1m. l&t 10
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com