Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3113)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13411)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2382)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2393)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1202)
Question
how to calculate quantities of sand , cement & aggregate in 
1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 
10cm brick wall, paint quantity for 1m2 snowcem and lime 
painting?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
1. Grade of concrete M20 so ratio is 1:11/2:3
let volume of concrete - 1cum
total ratio- 1+1.5+3 = 5.5
cement = 1x1.54/5.5 = 0.28 cum so cement is =0.28x
1440Kg/cum = 403.2 Kg = 8.064 bags
sand-0.28*1.5= 0.42cum
aggregate- 2.8*3= 0.84 cum

2. plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144

calculate 1/3rd of mortar when
dry= .0144*1/3+.0144= .0192cum

summation of ratio = 7
cement= .0192/7=.00274cum
= .0789bags
sand= .00274*6=.0164cum

this formula applied for 6mm and 20mm also.
plaster area= paint area
 
Is This Answer Correct ?    53 Yes 15 No
V.purushotham
 
Answer
# 2
1. Grade of concrete M20 so ratio is 1:11/2:3
let volume of concrete - 1cum
total ratio- 1+1.5+3 = 5.5
cement = 1x15.4/5.5 = 2.8 cum so cement is =2.8/.347=8 bags
sand-2.8*1.5= 4.2cum
aggregate- 2.8*3= 8.4 cum

2. plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144

calculate 1/3rd of mortar when
dry= .0144*1/3+.0144= .0192cum

summation of ratio=7 so cement= .0192/7=.00274cum
= .0789bags
sand= .00274*6=.0164cum

this formula applied for 6mm and 20mm also.
plaster area= paint area
 
Is This Answer Correct ?    40 Yes 35 No
Sjtbehera
 
 
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what r remedies taken for foundation in black cotton soils..??   1
in construction feild make the column rods are uneven ( e.g 1 column we have 6 nos of bars that 6 nos of bars are varrious level- 1 bar 10';2 bars 9';3 bars 8') what is resion to put different level if difference are required or not?   3
state the difference between direct and indirect cold water supply scheme   1
how to calculate rate analysis of M25 grade concrete Simplex 5
Which is beneficial for shuttering a Plywood os accrow plate & why ?   2
how to calculate concrete quantity from its density or details mentioned in rmc batch report.   1
y we need to take 28 days strength as compressive strength ? y cant we take 30 th day   2
Minimum spacing of 2- bars in column, beam, slab   8
1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3" UltraTech 17
how to calculate cement mortor for wet and dry mix for different ratios   1
why cracks are being developed in a structure? any specific reason? is there any remedial solution?   4
what bending moment?   3
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   