ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3113)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13416)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2382)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2393)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1202)
Question
Cube tests of concrete are failed at 7 days and 28 
days.What is your next action?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
NEXT ACTION IS NON DESTRUCTIVE TEST 
Is This Answer Correct ?    47 Yes 10 No
Imam
 
Answer
# 2
ensist contractor to hold skilled man power with quallity
material. note the result in daily work progress and mark
on structure which is not as per specification. finally go
for NDT if also structure fails then we have to demolish &
reconstruct the same
 
Is This Answer Correct ?    33 Yes 6 No
Abhijit
 
 
 
Answer
# 3
Any is code not give the clause regarding demolishing of
structure if cube fails in 28 days. but IS 456 & 516 give
the clause if strength of cube is less than FCK then
proceed for NDT Test i.e Rebound hammer if fail then go for
Ultrasonic test after all the NDT fail then proceed for
Core cutter also if U found result less then FCK then go
for Retrofitting with suggestion of consultant.
 
Is This Answer Correct ?    21 Yes 1 No
Vaibhav Jadhav
 
Answer
# 4
Go for NDTest, if it is not satisfied go for Core test that
is also failed go for concrete strengthing process As per
structural consultant comments
 
Is This Answer Correct ?    15 Yes 2 No
Nravindran
 
Answer
# 5
Well. When Concrete cube test result fails at 28th day then
go for concrete core cutting and check the compressive
strength in it. Number of cores shall be as per the
engineer incharge's decision but should not be less than 3
nos. IS:456 says if the core test fails then go for load
test. IS : 456 also says that NDT can be done . But with
rebound hammer test only surface hardness will be known and
hence this test result is not reliable and hardly anyone
suggests for this test.
 
Is This Answer Correct ?    13 Yes 2 No
Vimalsekar
 
Answer
# 6
Use concrete tester rebound hammer for strength after
calibration.
Perform test as per standard,if results is more than 100 %
of requirement by calibration graph of hammer continue the
structure.
 
Is This Answer Correct ?    9 Yes 1 No
Shafqat
 
Answer
# 7
NDT testing has to be done and if it fails then go for
recto method that is strengthing of concrete and concern is
not demolish it's time taken and it will effect time and
finacial.
 
Is This Answer Correct ?    7 Yes 4 No
Kishorecivil
 
Answer
# 8
Go for NDT If it is not satisfied go for Core test that
is also failed go for there possibale demolisan that coloum
it is not possible we go for Restrengthing.
 
Is This Answer Correct ?    1 Yes 1 No
Prabhakara Rao.b
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
how many area req.in 15000liter water tank   7
Rectangular room is more effective than a square room because ––   1
what is ppc???? L&T 13
What is the life of reinforcement?   3
what is a steel formula   12
what is mean by eccentric footing?   2
What are the grade of steel used in the steel design.? Engineers-India-Limited 14
yet i am not got any hallticket from aai junior excequtive exam.any one got application form from aai. AAI-Airports-Authority-Of-India 2
What is cutting Length of stirrups of a beam 300mm*300mm.   3
Middle point of any slab is raised 10-12 mm during shuttering work because––   4
what is the thikness of binding wire please quick response omaxe 5
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright © 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com