ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip   SiteMap shows list of All Categories in this site.
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
types of reviews
 Question Submitted By :: Ghfg
I also faced this Question!!     Rank Answer Posted By  
 
  Re: types of reviews
Answer
# 1
peer review
lead review
client review
 
Is This Answer Correct ?    1 Yes 1 No
Dada
 
  Re: types of reviews
Answer
# 2
1. Requirements Review
2. Specification Review
3. Architecture Review
4. Detailed Design Review
5. Code Walkthrough
 
Is This Answer Correct ?    0 Yes 1 No
Nandakumar
 
 
 
  Re: types of reviews
Answer
# 3
Modulator
Reader
Recorder
Reviewer
Owner
 
Is This Answer Correct ?    0 Yes 3 No
Ramesh
 
  Re: types of reviews
Answer
# 4
Type of reviews is 

 Informal Reviews or (peer reviews)
 Semiformal Reviews
 Formal Reviews
 
Is This Answer Correct ?    3 Yes 0 No
Balamurugan.p
 
  Re: types of reviews
Answer
# 5
buddy check
walkthrough
inspection (formal technical review ) >> black box testing
 
Is This Answer Correct ?    0 Yes 1 No
Anuradha
 
  Re: types of reviews
Answer
# 6
Types of Reviews:

1. Informal Review:

Generally one to one meeting.

No agenda.

Results are not formally reported.

Occurs as needed throughout each phase.




2. Semi Formal Review:

Facilitated by the author (the person who is responsible for
the activity).

Presentation is made with comment throughout and at the end.

Reports are distributed to the participants.

Possible solutions for defect not discussed.

Occur one or more times during phase.

3. Formal Reviews:

Facilitated by the modulator (the person who has link
between test engineer and
Management).

Assisted by a recorder.

Meeting are planned in advance.

Directly dependent on the preparation of participants.
 
Is This Answer Correct ?    0 Yes 3 No
Rajendra
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
what and how to do application testing?  2
Hi. Can somebody please tell me the format to create test cases from use cases. iViz1
What is the testing lifecycle and explain each of its phases (eswar)  1
In which situation or phase or any did u find that Manual testing is a must instead of Automation testing  4
Use of Requirements Traceability?  2
What is the difference between User Acceptance Testinga and System Testing? EDS9
Write the Test Cases for Ball Pen and Water Bottle. Quexst10
What is Cycle Testing? Not Testing Life Cycle?  2
what is the deferent between Bug and Defect(error) ? Nedbank5
How will you test Email field? IMC5
what is the diff b/n testing methodologies and testing techniques? Thomson3
hi some body help me to know the difference between testing and quality control and quality analyst?  2
Can anybody describe what might be the reasons or situations where the developer doesn't accept a bug as a bug , raised by tester ? Accenture8
what are the bugs in job portals and hospital managemant projects..if anyone havin experience in testin these porjects then friends share your experience what could be the bugs TCS1
Case study like you have been assigned in a team which going through a crucial phase of the project. Then how you can save your project to release on time without any defect leakage…. ABC2
Why do u want to change the job? Minecode3
diff between usecase and testcase  7
give me an example of high severity and low priority.And low severity and high priority Vertex6
What is Deffered? explain it who allocate it? BeBo-Technologies7
when will do the beta test? when will do the alpha test?  4
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com