ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3120)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3299)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13430)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2394)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
how is the wastage component in structural steel being 
considered while doing the reconcillation for the 
fabrication with returning of scrap under 1 meter length
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
as per indian standards only 3% wastage is allowed
out of this 2 % is considerable and 1 % in non considerable
 
Is This Answer Correct ?    25 Yes 0 No
Dushyant Bansal
 
Answer
# 2
wastage is considered as 5% in a metric ton. 
Is This Answer Correct ?    11 Yes 7 No
Sandip Panda
 
 
 
Answer
# 3
U are saying indian standards. In which code it is given?? 
Is This Answer Correct ?    3 Yes 0 No
Athiyan
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
How to preparation billing for high rise building? anyhow can give the tips L&T 2
What is '43' in OPC43 cement? What is '35' in M35 grade of concrete? Is there any link between them ? RITES 3
How manu days after the casting of a slab another slab can be casted above it? what is the total curing time of a slab if ponding is not done on it?   6
how to calculate steel columns beams and slab please give me brief calculation Haven-Foundation 14
what is the function of fineness modulus to determine the concrete mix?   1
NUMBER OF CEMENT BAGS REQUIRED FOR CONCRETING 1000 SQUARE FEET SLAB OF 4 INCH THICKNESS. TATA 5
types of concrete?   8
difference between deep and shallow well?   6
what is the cutting length for circular ring???please clarify.   6
what are the Cement Coefficient for Block Work & plastering Work?   1
uses of M50 and M60 grade ordinary and pozzolona portland cement concrete?   1
at what height brick masonr, block masonry & Concrete wall can construct in a day ?   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com