ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Mechanical Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3010)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3270)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13221)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2348)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (407)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (76)
 Bio Engineering interview questions  Bio Engineering Interview Questions (16)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (162)
 Instrumentation interview questions  Instrumentation Interview Questions (2317)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (104)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (73)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1189)
Question
What is plant load factor?
 Question Submitted By :: Sumit5409
I also faced this Question!!     Rank Answer Posted By  
 
  Re: What is plant load factor?
Answer
# 1
"Load Factor" is an indicator of how steady an electrical
load is over time.

If your electric billing rate includes both an Energy (kWh)
and Demand (kW) charge, your load factor can be calculated
by the following formula:
L.F. (percent) = [(Total kWh)/(# Days in Bill Cycle x 24
hrs/day)]/[Peak kW Demand]
If your load factor is low, you should look for ways to
even out your electrical usage (i.e., shift energy
intensive processes to periods of otherwise low usage).
By increasing load factor, you will reduce the impact of
monthly demand (kW) charges on your bill.

LF = average demand / peak demand
for a given period of time.
 
Is This Answer Correct ?    10 Yes 3 No
Karthikeyan
 

 
 
 
Other Mechanical Engineering Interview Questions
 
  Question Asked @ Answers
 
bearings types   5
How much mass of oxygen is required to convert 1kg of carbon into 11/3kg of co2. explain   1
differences b/w two stroke engine and four stroke engine?   5
boils laws   5
is there any limit to step up the voltage in transformer???   1
what is penthouse in boiler BMW 2
What is thermodynamics?   3
Are you applying for other jobs?: Petro-Star-Mount 1
In a boiler Natural gas flow 10,000 N cubic meter and combustion air flow 22,000 cubic meter, how I convert gas flow N cubic meter to cubic meter to maintain fuel air ratio? Thank you. ashekullah   3
If any machinery or transmission needs periodic and regular lubrication what is the best method to give it?   1
What do you consider to be your job's most important assets?   1
What is BTU?   3
 
For more Mechanical Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com