ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Mechanical Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3151)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3304)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13476)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2395)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (424)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2407)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (111)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (81)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1205)
Question
What is plant load factor?
 Question Submitted By :: Mechanical-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
"Load Factor" is an indicator of how steady an electrical
load is over time.

If your electric billing rate includes both an Energy (kWh)
and Demand (kW) charge, your load factor can be calculated
by the following formula:
L.F. (percent) = [(Total kWh)/(# Days in Bill Cycle x 24
hrs/day)]/[Peak kW Demand]
If your load factor is low, you should look for ways to
even out your electrical usage (i.e., shift energy
intensive processes to periods of otherwise low usage).
By increasing load factor, you will reduce the impact of
monthly demand (kW) charges on your bill.

LF = average demand / peak demand
for a given period of time.
 
Is This Answer Correct ?    12 Yes 5 No
Karthikeyan
 

 
 
 
Other Mechanical Engineering Interview Questions
 
  Question Asked @ Answers
 
Hello sir i had completed my BE in production engg.After diploma in mechanical engg.now i want to do BE in mechanical engg.that is double degree.Anyone can please tell me is there any provision to do this and how much is course duration.   1
How many isomers have the name bromomethylcyclopentane?   1
How to calculate outer dia and width of the bearing   2
what is the responsibility of production department ?   1
What is the significant of ZERO degree kelvin ? why it is not possible to achieve it? Tech-Mahindra 2
What is mean by Resistance welding Toyota 4
What is the normal Ph value of boiler water RRB 2
What is MVA, KVA, X-mer ?   1
WHAT IS DIFFERENCE BETWEEN ANNEALING,TEMPERING AND NORMALIZING   3
What is meant by cigarcone? RRB 3
HOW TO CALCULATE CFM OF FAN?   1
What trouble could result if the main engine is using a low grade of fuel?   1
 
For more Mechanical Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com