how many nos of National highway in India.
Answers were Sorted based on User's Feedback
Answer / n.rajeev d.c.e
total numbers of national highways in india 228.
Is This Answer Correct ? | 74 Yes | 33 No |
Answer / om_narayan15
Total nos of National Highway In India 242.
Is This Answer Correct ? | 56 Yes | 42 No |
Answer / rahul kumar
total number of national highway in india is 235
Is This Answer Correct ? | 9 Yes | 6 No |
Answer / saroj
All national highways in india is re-numbered in place of existing number. in present total no. of NH is 218.
for more details plz refer Govt of india. ministry of road transport and highway's letter no. NH-14019/9/2007-P&M dated the 28th april 2010.
Is This Answer Correct ? | 9 Yes | 8 No |
the beam size (450x1000) effective length is 19.0mts no intermediate supports and top 8nos 32dia and bot 32dia and condition is stragge lap. it is exceeding lap zones and exceed length of bars?
why we take cube depth 150mm for testing
How to take measurement of plastering beam and column.
Why is concrete cube test carried out?
1.0 what is the permissible westage of steel in structural steel fabrication say gantry , trustle of power plant unit 2.0 what is the permissible westage of cement in construction work as above
Define graphics window?
Clarify the out turn of steel fixer in construction field
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
How many pyramid in egypt?
what is the difference between the splice & Lap length.