ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Software >> Testing >> QA Concepts
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions (5206)
 Manual Testing interview questions  Manual Testing Interview Questions (6496)
 QA Concepts interview questions  QA Concepts Interview Questions (656)
 Mobile Testing interview questions  Mobile Testing Interview Questions (115)
 Test Cases interview questions  Test Cases Interview Questions (469)
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions (58)
 Testing AllOther interview questions  Testing AllOther Interview Questions (609)
Question
What is a non-conformance report (NCR)?
 Question Submitted By :: QA-Concepts
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
A Report raised during Quality System Audit on the
processes whenever it violates from the Quality System
Standards,Policies,Procedurs and whenever it fails to
deliver consistency in the Customer Satisfaction and
Continual Improvement.
 
Is This Answer Correct ?    444 Yes 40 No
Suresh Kumar
 
Answer
# 2
A report outlining a deviation from product, process,
procedure, or compliance specifications.
Examples:

-A measured part dimension is spec'd to be .250" +/- .002.
It fails as measured at .257". It is a non-conforming part
and must be reported.

-An operator fails to follow procedure.

-A regulatory report is not filed on time.


The non-conformance report includes who, what, where, when.

The report generally initiates an investigation into Root
Cause (why).

It generally escalates to CAPA (Corrective and Preventative
Action) - steps to immediately correct and systemically
prevent (how) the non-conformance.
 
Is This Answer Correct ?    292 Yes 16 No
Jimdeli
 
 
 
Answer
# 3
A failure to comply with a requirement of a company's
quality system standard.
 
Is This Answer Correct ?    120 Yes 14 No
Praveen
 
Answer
# 4
it is a report outlning a deviation from
products,process,procedure or compliance specifications
 
Is This Answer Correct ?    67 Yes 7 No
Rafael
 
Answer
# 5
Failure to fulfill the requirement or procedure or other
relevent document has not been met then you have a non
conformance
 
Is This Answer Correct ?    48 Yes 9 No
Pattan Arshe Ali Khan
 
Answer
# 6
Non-conformance reports shall be raised ations and
engineering standard requirements are violated in
material,workmanship or procedure.
 
Is This Answer Correct ?    40 Yes 6 No
Rafael L Dela Cruz
 
Answer
# 7
Not complying th statutory requirement. or in other words
whatever the prequisite isignored by executor.
 
Is This Answer Correct ?    42 Yes 22 No
Balwan
 
Answer
# 8
any unexpected:Action,occurrence,happening or situation
that has the possibility of affecting the
quality,potency,purity,safety or identity of the product.
 
Is This Answer Correct ?    54 Yes 38 No
Adeeba
 
Answer
# 9
A report issued when a product, process or procedure does not comply with the set standards for a particular belonging to the product, process or procedure under inspection 
Is This Answer Correct ?    15 Yes 1 No
Sarnsh Sahu
 
Answer
# 10
Nonconformance:- Any product or material which does not
conform to the customer requirements or specifications,that
time we can raise Nonconformance against that
product/material.

Nonconformity:- When a process which does not conform to a
quality system requirement,That time we can raise
Nonconformity against that process(May be ISO stds,CMMi etc)

The Report we are sending to respective managers about
NC,is called NCR.This report contains NC and CAPA
(Corrective Action and Preventive actions)details along
with NC tracking and closing.Before sending NCR we should
check whether the correct process or specification
mentioned in Manual/PSD(Product Specification Documents)
 
Is This Answer Correct ?    14 Yes 0 No
Santhosh Sebastian
 

 
 
 
Other QA Concepts Interview Questions
 
  Question Asked @ Answers
 
What are SCORM Standards?   4
is any body looking for job in software testing   4
I'm looking for a list of software testing conferences, please help me.   1
what is compliance testing Kanbay 6
I'm looking for a latest news on software testing, please help me.   1
How would you test an ATM Machine?   4
Difference between Defect Removal efficiency and Defect containment effectiveness Cap-Gemini 1
Have u ever converted test scenarois into testcases? If so how? MBT 1
How will you ensure that all the requirements have been covered during the test cases review FIC 1
What is SDLC? What is QA methodulogy?   5
What are the deliverables of Test Plan Ordain-Solutions 4
If every alternative letter starting from B of the English alphabet is written in small letter, rest all are written in capital letters, how the month "September" be written. (1) SeptEMbEr (2) SEpTeMBEr (3) SeptembeR (4) SepteMber (5) None of the above.   2
 
For more QA Concepts Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com