Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3112)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13406)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2381)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2390)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1201)
Question
how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Let Area to be plastered=100 m^2
& Thickness of plaster= 12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+5=6
For 12mm plastering in 1:5 cement:sand mortar mix,

1)Cement required= 1.92/6= 0.32 cu. m
No. of bags of cement= 0.320/0.0347=9.22 bags
>>9 bags(say)
Kgs of cement required=9 x 50= 450 kg (approx)

2)Sand required= [1.92 x (5/6)]= 1.60 cu. m


[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347
 
Is This Answer Correct ?    155 Yes 9 No
Rajarshi Basu
 
Answer
# 2
cement:sand= 1:5
for 1cum= 1/6
=0.166
so cement for 1 cum=0.166cum
but volume of 1 cement bag is=.033cum
bag required per cum is=.166/.033
=5 bags
sand required is=0.166*5
=0.833 cum
 
Is This Answer Correct ?    73 Yes 36 No
Ashwin
 
 
 
Answer
# 3
let Area to be plastered=100 m^2
& Thickness of plaster= 12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+5=6
For 12mm plastering in 1:5 cement:sand mortar mix,

1)Cement required= 1.92/6= 0.32 cu. m
No. of bags of cement= 0.320/0.0347=9.22 bags
>>9 bags(say)
Kgs of cement required=9 x 50= 450 kg (approx)

2)Sand required= [1.92 x (5/6)]= 1.60 cu. m


[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347
 
Is This Answer Correct ?    33 Yes 6 No
Sandeep Tv
 
Answer
# 4
above ansewr is corect 
Is This Answer Correct ?    31 Yes 6 No
Munir
 
Answer
# 5
anser plz
 
Is This Answer Correct ?    36 Yes 17 No
Yuy
 
Answer
# 6
1:5 PLASTERING CEMENT REQUIRED IS 288 KGS 
Is This Answer Correct ?    34 Yes 22 No
Jegan
 
Answer
# 7
why should we have to take 20% of wet mortar & 1/3rd of Dry mortar......is there eny code for that...or plz tell me where it coms from......plz clear me .... 
Is This Answer Correct ?    3 Yes 1 No
Hidayathulla
 
Answer
# 8
Let Area to be plastered=100 m^2
& Thickness of plaster= 12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+5=6
For 12mm plastering in 1:5 cement:sand mortar mix,

1)Cement required= 1.92/6= 0.32 cu. m
No. of bags of cement= 0.320/0.0347=9.22 bags
>>9 bags(say)
Kgs of cement required=9 x 50= 450 kg (approx)

2)Sand required= [1.92 x (5/6)]= 1.60 cu. m


[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347
 
Is This Answer Correct ?    3 Yes 2 No
Yogesh Khandelwal
 
Answer
# 9
Area 100 SFT 100*1.54 =154 CFT
Ratio 1:5 Sum of ratio 1+5=6
Cement 1/6*154 = 25.66 CFT
Bag 25.66/1.25=20.528 Say 21 Bags
Sand 5/6*154 =128.33 CFT
 
Is This Answer Correct ?    1 Yes 0 No
Saqib
 
Answer
# 10
1:5 proportion for (1)cement @ 40kg): (5)sand @ 33 kg(S.G
@2.6) gives you approximate volume of 0.142 cubic meter.

if you want exact volume, provide the specific gravity of
your materials and include air content and water for your
volume...
 
Is This Answer Correct ?    0 Yes 0 No
Adz
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
who to calculate the bar bending schedule? APPSC 2
how much cement consumption in 1 sqmt of wall cleading work (dedo)?   4
define formwork   1
convert 1cum how many kilo   7
1 liter emulsion paint covered how much area? DEWA 7
What is Rodding in Chimney construction? SSC 1
i have a bar of 36 dia in column, what is the lap length?   11
can u use instead of water milk for concreting   7
how many bricks in 1 one cubic meter?   2
14. List 3 of your strongest points as a worker?   2
what is the weight of 12 mm 40 mm aggregate?   1
what is the purpose of laying PCC?   15
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com