ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3073)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3287)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13323)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2364)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2375)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (75)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
What should be percentage of silt content in sand?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
percentage of silt content in the sand should preferably be
less th 6 percent to 8 percent
 
Is This Answer Correct ?    34 Yes 13 No
Narendra
 
Answer
# 2
What is the IS code 
Is This Answer Correct ?    13 Yes 6 No
Babu.a
 
 
 
Answer
# 3
BY VOLUME=7%(MAX) & BY WGT=4%(max) 
Is This Answer Correct ?    6 Yes 2 No
Fahimabid
 
Answer
# 4
less than 7 % 
Is This Answer Correct ?    4 Yes 0 No
Sandip Kakde
 
Answer
# 5
sand silt % = 8% 
Is This Answer Correct ?    2 Yes 1 No
Satheesh Kumar
 
Answer
# 6
Material finer than 75 micro meter (No200) sieve:
Concrete subject to abrasion is 3 average
and All other concrete is 5 Average(mass percent of Total
Sample,) max
Ref:ASTM C33-02a Table-1
 
Is This Answer Correct ?    1 Yes 0 No
Qc
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what in total station list counting   2
what is a louer? and for which purpose it will be used. GMR 3
what is the strength [final]of grade m 15 to m 45   1
what is mean by hysd bar? L&T 4
WHY IS COVER PROVIDED IN BEAMS, SLABS, LINTELS, COLUMNS, etc ? WHAT IS THE DRAWBACK OF NOT PROVIDING COVER IN THE SAME?   8
how much aggregate need for 1:4:8 p.c.c in 1sqm area?   4
How many no of cement bags required to do the concrete with the proportions 1:1.5:3 for 4inch thickness for 100 sqft?   3
How Mney Layers in 8mm plywood Orbit-Corporation 2
how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft) Unity-Infraprojects 2
Can fly ash bricks can be used in brick bat coba?   1
what"s the abbreviation for P.C.C? what"s the formula to calculate 1m3 P.C.C consumption? Punj-Lloyd-Ltd 2
WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY EMPLOYED   4
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com