Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3120)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3299)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13430)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2394)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
What should be percentage of silt content in sand?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
percentage of silt content in the sand should preferably be
less th 6 percent to 8 percent
 
Is This Answer Correct ?    34 Yes 13 No
Narendra
 
Answer
# 2
What is the IS code 
Is This Answer Correct ?    13 Yes 6 No
Babu.a
 
 
 
Answer
# 3
BY VOLUME=7%(MAX) & BY WGT=4%(max) 
Is This Answer Correct ?    6 Yes 2 No
Fahimabid
 
Answer
# 4
less than 7 % 
Is This Answer Correct ?    4 Yes 0 No
Sandip Kakde
 
Answer
# 5
sand silt % = 8% 
Is This Answer Correct ?    2 Yes 1 No
Satheesh Kumar
 
Answer
# 6
Material finer than 75 micro meter (No200) sieve:
Concrete subject to abrasion is 3 average
and All other concrete is 5 Average(mass percent of Total
Sample,) max
Ref:ASTM C33-02a Table-1
 
Is This Answer Correct ?    1 Yes 0 No
Qc
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
9*9m 1:4:8 ratio using what quantity of 40mm aggregate, sand&cement please tell anwser L&T 3
can we use .5 water-cement ratio for any type of cement?   7
what we execute firstly wall tile or floor tile? Colliers-International 7
What is the difference between Normal Concrete and High density concrete?   2
shearing strength of cohesionless soil depends upon dry density rate of loading confining pressure all above   1
how to find hardness of water?why it should be determined?   1
the ratio of liquid limit to plastisity index for the soil mass is called liquidity index shrinkage ratio consistancy index none   1
what is step foundation   2
IN SITE HOW WE CAN IDENTIFY ONE WAY SLAB AND TWO WAY SLAB?   9
what is Quality Reporting?   3
Define Finite element method (FEM)   6
what is meant by expansion joints in concrete structures? L&T 4
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com