ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3011)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3270)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13223)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2348)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (407)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (76)
 Bio Engineering interview questions  Bio Engineering Interview Questions (16)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (162)
 Instrumentation interview questions  Instrumentation Interview Questions (2317)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (104)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (73)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1189)
Question
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
 Question Submitted By :: Mzbsacet
I also faced this Question!!     Rank Answer Posted By  
 
  Re: plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
Answer
# 1
Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
 
Is This Answer Correct ?    40 Yes 12 No
Siva Rami Reddy
 
  Re: plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
Answer
# 2
cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags
 
Is This Answer Correct ?    21 Yes 11 No
Vkg
 
 
 
  Re: plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
Answer
# 3
If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.
 
Is This Answer Correct ?    13 Yes 9 No
Ehaque9499
[M/S Samiah International Builders Pvt. L]
 
  Re: plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
Answer
# 4
Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm
 
Is This Answer Correct ?    25 Yes 6 No
Aparajita Swain
 
  Re: plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
Answer
# 5
If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.
 
Is This Answer Correct ?    9 Yes 2 No
Rajeeb Lochan Rout
 
  Re: plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
Answer
# 6
p.c.c & r.c.c mix ratio is not given.in case p.c.c m10 &
r.c.c m20. the rate will be changed from site condition and
sorrunding the area how much cost price in raw materials
which type of cement we will used in r.c.c & p.c.c
 
Is This Answer Correct ?    12 Yes 0 No
Vignesh
 
  Re: plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
Answer
# 7
rcc for per cum
rate 4750
pcc per cum rate
25000
brick work rate per sqm 4000
 
Is This Answer Correct ?    4 Yes 3 No
Amitkumarkushwaha
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
how much quantity of binding wire required for tieing of 1mt of reinforcement bar?   4
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???   3
what is the minimum and maximum water cement ratio   5
What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump value for Pile concrete? Slab concrete? Column concrete?   3
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl Thermax 2
binding wire requirement in rcc structures   5
what is the crushing strength of good building stone   1
HOW MUCH LAP LENGTH PROVIDED IN COMPRESSION AND TENSION IN BRIDGES?   2
Of all curing compounds available, can they use compounds with micro silica in lieu of water? Why? Saudi-Aramco 1
what is pmc(in rigid pavement)   1
plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?   1
all engineering filed in which branch mother branch L&T 21
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com