ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3129)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3300)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13439)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2401)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (80)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
 
Is This Answer Correct ?    41 Yes 12 No
Siva Rami Reddy
 
Answer
# 2
Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm
 
Is This Answer Correct ?    26 Yes 6 No
Aparajita Swain
 
 
 
Answer
# 3
p.c.c & r.c.c mix ratio is not given.in case p.c.c m10 &
r.c.c m20. the rate will be changed from site condition and
sorrunding the area how much cost price in raw materials
which type of cement we will used in r.c.c & p.c.c
 
Is This Answer Correct ?    15 Yes 0 No
Vignesh
 
Answer
# 4
cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags
 
Is This Answer Correct ?    22 Yes 11 No
Vkg
 
Answer
# 5
If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.
 
Is This Answer Correct ?    9 Yes 4 No
Rajeeb Lochan Rout
 
Answer
# 6
If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.
 
Is This Answer Correct ?    14 Yes 10 No
Ehaque9499
 
Answer
# 7
rcc for per cum
rate 4750
pcc per cum rate
25000
brick work rate per sqm 4000
 
Is This Answer Correct ?    4 Yes 3 No
Amitkumarkushwaha
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
Is there any alternate for plastering   1
How do you find the difference between 53&43 grade cement in site?   6
how many cubic ft. for 50 kg ( 1 bag ) cement?   18
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing   1
difference between high rise & multistoried building?   1
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved. HCC 13
Where are laterally loaded piles are used in practice? Simplex 1
what is meant by civil engineer?   2
what is the creep in concrete L&T 4
Key is put at the time of casting 1st lift of column to get– –   1
WHY THERE IS NO USE OF SEA WATER IN PRODUCING ELECTRICITY Infosys 16
what is the safe bearing capacity of hard murum? can we consider it 50 ton?m2   1
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright © 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com