ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3119)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3299)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13431)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2394)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
 
Is This Answer Correct ?    41 Yes 12 No
Siva Rami Reddy
 
Answer
# 2
Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm
 
Is This Answer Correct ?    26 Yes 6 No
Aparajita Swain
 
 
 
Answer
# 3
p.c.c & r.c.c mix ratio is not given.in case p.c.c m10 &
r.c.c m20. the rate will be changed from site condition and
sorrunding the area how much cost price in raw materials
which type of cement we will used in r.c.c & p.c.c
 
Is This Answer Correct ?    15 Yes 0 No
Vignesh
 
Answer
# 4
cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags
 
Is This Answer Correct ?    22 Yes 11 No
Vkg
 
Answer
# 5
If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.
 
Is This Answer Correct ?    9 Yes 4 No
Rajeeb Lochan Rout
 
Answer
# 6
If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.
 
Is This Answer Correct ?    14 Yes 10 No
Ehaque9499
 
Answer
# 7
rcc for per cum
rate 4750
pcc per cum rate
25000
brick work rate per sqm 4000
 
Is This Answer Correct ?    4 Yes 3 No
Amitkumarkushwaha
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?   3
What letter follows after these, O, T, T, F, F, S, S, E, __? Alstom 2
the minimum percentage of steel for 2m rcc slab L&T 5
how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4 L&T 3
how many grades in concrete? list out McNally 6
why there is need to provide shear reinforcement?give the basic reason? Power-Grid 7
at what height brick masonr, block masonry & Concrete wall can construct in a day ?   2
what is the development length?   1
What is the difference between opc cement to ferro cement   1
Life of Rcc is taken as 100 years. What will be the life of structure after 10 years. will the strength of concrete increases or decreases.   7
slump test report   2
How to know proportions of cement, sand, aggregate in different types of grades like M5, M10, M20, M30?   6
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   