If i am running of spindle at 2000rpm ,but How to spindle stop at the second I am resetting the machine in CNC machines
1199When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt
2396Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.
1466for 100 HP Induction motor service factor is 1.2(SF) we placed a VFD at the motor side load is balance with 0.3 Amp's Phase to Phase but at incoming of VFD load is un-balance with 10 to 20 Amp's what will be cause of load un balance
1488Post New Electrical Engineering Questions
Can we check ELCB constantly from R1 to R8 phase in 1 no DB?
how to control the speed to switched reluctance motor
What are the disadvantages of autotransformer?
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.
a starter used for squirrel cage induction motor?
what's the exact magnitude of current, flows through Neutral?
what is effect of 5amp fuse on 2mva pry protection of transformer
Why syn. Generators are used for the production of electricity?
PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.
i want wipro vlsi placement pattern please send me
What is mean by hot and cold loop testing? What is the difference between them?
300m long and 30kw inductive loade 3phase supply how many size cable required