Engineering Interview Questions
Questions Answers Views Company eMail

What kind of Neutral CT can be placed in 11/0.433KV transformer to be used and what are its specification?

1355

How can i do RCC rate analysis?

1226

Dear all,recently in our plant we installed a conveyor for this the motor ratings are 5 hp and Amps 7.39.Due to on urgent starting of conveyor we fix the DOL starter with range of 9-15 amps.give me suggestion regarding on this issue

1 1697

Howmuch bend to be provide for 200/600 BEEM

1176

How to do bbs in excel format

1565

Question 99 - (a) The quantum number m is given by m = -s, -s + 1. If s = 0.5, find the values of m. (b) | T > = (cos T) | V > + (sin T) | H >. The V and H states form a basis for all polarizations. Let cos T = 0.8. (i) If (sin T)(sin T) + (cos T)(cos T) = 1, find the value of sin T. (ii) For | T > = a | V > + b | H >, where a x a represents the probability of | V > and b x b represents the probability of | H >. Which one is more abundant, | V > or | H >? (iii) Find the value of T without using any mathematical tools.

1 1508

How much quantity a carpenter can do in a day

1 2072

do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

1197

how to calculate weight of 1.8 cum of aggregate

Engisol,

1274

What are the questions asked in PRDC pool campus test?(bangalore)

PRDC,

1 3297

I have energy meter for educational project having 0.5s class but my friend need 0.2s class meter , which one is good for that purpose and what is the actual difference of that two classes , need very easy example also.??

BBS,

965

will I find the mechanical engineering interview question for asian paints?

Asian Paints,

994

what is Instrument Schedule, and what it is mainly used for?

1101

In an existing power plant (phase I) with step up transformers (3nos) with Ynd1 vector group to the 400KV bus bar,an extension power plant (phase II) with transformers (4nos) with Ynd11 vector group >. what are the consequences of such configuration ,please note that % impedance are also differ i.e. 15% & 10.5% the reason was that auxiliary supply interface is at different voltage levels i.e 400v & 6.6KV in phase i and phase II respectively .please advise ! Thank you !

1 1313

I am experienced with house and industrial wiring but I don't have any licence how can I apply an licence and which type of licence i can get i didn't complete deee just only experience

Future Electrical,

1186


Un-Answered Questions { Engineering }

How to measure the earth resistance value in a concrete pavement(flood light area)?

1695


what is asynchronous data transfer???

1231


how flow current in 220 kv line to line

1523


what is the difference between megger and earth resister ??

1299


how can we phase identification in a distribution line,how we recognise that which phase is coming for a house hold connection.help me............

1565






What is meant by a bit?

524


why normally Generator rating are between 11Kv to 22Kv?

3678


what is proper capacitor placement? How to evaluate capacitor size?

1620


What is the difference between scavenging and supercharging ?

774


What is monotonic dac?

595


what is meant by brushed alternator & its working principle ?

1523


what is Brick crushing strength(PSI)?

811


A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

1692


Does the extrusion process for a355 and a356 alloy effect on the amount of impact energy?

516


what is electrical machines

2973