| Answer |
SET UP TIME:THE TIME TO MAKE FIRST ACCEPTED PIECE WHICH
INCLUDES BRINGING ALL THE TOOLS ,JIGS AND FIXTURES,SETUP
THOSE JIGS ETC;FOR PARTICULAR BATCH QUANTITY. WHERE AS
OPERATION TIME IS THE TIME WHICH WILL BE THE TIME TO
COMPLETE EACH.  |
2 | Guest |
| |
| |
| Answer |
time require to to make setting
time requre to complete operation  |
0 | Dhaval Samanai |
| |
| |
| Answer |
technical test papers, mechanical  |
0 | Guest |
| |
| |
|
|
| |
| Answer |
Setup time is the time required to bring an action into
ready state.
Operation time is the total time taken to complete the
operation of the setup.  |
0 | Shantan Kumar.r |
| |
| |
| Answer |
Setup Time is the Machine Sating Time for Operation such as
tool setting,jigs And fixture Setting Etc.
Whare As poperation time is the total operation time or we
can say operation cycle time.  |