ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip   SiteMap shows list of All Categories in this site.
Google
 


 

Company >> Accel >> Accel Questions
 
 Fidelity technical test questions  Fidelity Technical Test Questions (2)  CTS interview questions  CTS Interview Questions (3)
 
Back to Questions Page
Question   Wht is the difference between Test case and Test condition Rank Answer Posted By  
 Interview Question Submitted By :: Laxmi
I also faced this Question!!   © ALL Interview .com
Answer
a test case is documented procedure to test a test condition 
a test condition can be defined an item or transaction which
can be verified by one or more test cases (a function ,a
transaction , a quality characteristic )
 
0 Manoj4testing
 
 
Answer
A test case is a set of conditions or variables by which a 
tester will determine if a requirement of an application is 
satisfied. 
There is a document having number of test cases which is 
called test case document and each condition to check is 
called test condition.
 
0 16.vidya
 
 
Question   how to find out the how many disks attached in the server? Rank Answer Posted By  
 Interview Question Submitted By :: Babureddy
I also faced this Question!!   © ALL Interview .com
Answer
format
 
0 Babureddy
 
 
 
Answer
1) format
2) P
3) P - this would give the list of partiotions and devices 
mounted
 
0 Guest
[TCS Ltd]
 
 
Answer
vollist
 
4 Sridhar
[TCS Ltd]
 
 
Answer
disks
 
0 Nagendra Kumar
[TCS Ltd]
 
 
Answer
INSCAN HP
DF, mount
prtvtoc
 
0 Lochan
[TCS Ltd]
 
 
Answer
by using format utility you can findout the no.of disks

#format
 
0 P.r.l.prasanna
[TCS Ltd]
 
 
Answer
To check the how may disk attached in the disk is ?

Format command it not acceptable and it is not good.
so go #prtdiag -v | more
hear u can see how many disk are attached and the conditions
of the disk weather it is good or bad.
 
0 Basha Phatan
[TCS Ltd]
 
 
Answer
The format command works is  x86 while prtdiag works on
Sparc based systems.
 
0 Stratovarius
[TCS Ltd]
 
 
Question   What is the need of z-order method? Rank Answer Posted By  
 Interview Question Submitted By :: Guest
I also faced this Question!!   © ALL Interview .com
Answer
Hi,
  Z order method is the use of the show the design of the
output form to use z order technique.
z order technique is Show view of the Z corner to print the
z style.
Z order is Access the data in the two dimension Array to
access data
Ex:
1234
5678
9065
 call Z order method to pass order For ex: pass 3
then output is
1396 to Access four corner of the z order

Thank & regard
 
0 Eklesh Parmar
 
 
Question   Explain the STLC? Rank Answer Posted By  
 Interview Question Submitted By :: Janu
I also faced this Question!!   © ALL Interview .com
Answer
STLC means it starts from the preparation of test plan, 
test case and ends with product release. Meanwhile we'l b 
involved in some other types of testing. Major tasks will b 
done in STLC are as follows,

1. Test Plan Preparation
2. Test Case Preparation
3. Execution of TC
4. Analyze the Result
5. Defect Report Preparation
6. Regression Testing
 
3 Senthil Kumar
 
 
Answer
hai,
 STLC means software testing life cycle.it begin depends on 
SDLC.
But STLC having phases it's starts from 
Test planing.
Test Development
Test Execution
Defect Repoting
Result Analysis.
 
2 Sujatha
 
 
Answer
STLC means Software Test life cycle, it starts with 
Test Initiation
Testplan preparation
Test design
Test Execution------------>Test Report
Test Closure
 
0 Neelavathy
 
 
Answer
I hope this will help u .to understand each activity under 
the test cycle.

u can reach me @ rami.cheers@gmail.com


Test Requirements 

? Requirement Specification documents
? Functional Specification documents 
? Design Specification documents (use cases, etc) 
? Use case Documents 
? Test Trace-ability Matrix for identifying Test Coverage

Test Planning

? Test Scope, Test Environment
? Different Test phase and Test Methodologies
? Manual and Automation Testing
? Defect Mgmt, Configuration Mgmt, Risk Mgmt. Etc
? Evaluation & identification ? Test, Defect tracking tools

Test Environment Setup

? Test Bed installation and configuration
? Network connectivity?s
? All the Software/ tools Installation and configuration
? Coordination with Vendors and others

Test Design
? Test Traceability Matrix and Test coverage
? Test Scenarios Identification & Test Case preparation
? Test data and Test scripts preparation
? Test case reviews and Approval
? Base lining under Configuration Management

Test Automation

? Automation requirement identification
? Tool Evaluation and Identification.
? Designing or identifying Framework and scripting
? Script Integration, Review and Approval
? Base lining under Configuration Management

Test Execution and 
Defect Tracking

? Executing Test cases
? Testing Test Scripts
? Capture, review and analyze Test Results
? Raised the defects and tracking for its closure

Test Reports 
and Acceptance

? Test summary reports
? Test Metrics and process Improvements made
? Build release
? Receiving acceptance
 
4 Rami Reddy
 
 
Answer
I hope this will help u .to understand each activity under 
the test cycle.

u can reach me @ rami.cheers@gmail.com


Test Requirements 

? Requirement Specification documents
? Functional Specification documents 
? Design Specification documents (use cases, etc) 
? Use case Documents 
? Test Trace-ability Matrix for identifying Test Coverage

Test Planning

? Test Scope, Test Environment
? Different Test phase and Test Methodologies
? Manual and Automation Testing
? Defect Mgmt, Configuration Mgmt, Risk Mgmt. Etc
? Evaluation & identification ? Test, Defect tracking tools

Test Environment Setup

? Test Bed installation and configuration
? Network connectivity?s
? All the Software/ tools Installation and configuration
? Coordination with Vendors and others

Test Design
? Test Traceability Matrix and Test coverage
? Test Scenarios Identification & Test Case preparation
? Test data and Test scripts preparation
? Test case reviews and Approval
? Base lining under Configuration Management

Test Automation

? Automation requirement identification
? Tool Evaluation and Identification.
? Designing or identifying Framework and scripting
? Script Integration, Review and Approval
? Base lining under Configuration Management

Test Execution and 
Defect Tracking

? Executing Test cases
? Testing Test Scripts
? Capture, review and analyze Test Results
? Raised the defects and tracking for its closure

Test Reports 
and Acceptance

? Test summary reports
? Test Metrics and process Improvements made
? Build release
? Receiving acceptance
 
0 Rami Reddy
 
 
Answer
STLC means software testing life cycle this process 
stararts with test initiation
     test planning
     test design
     test execution
     reporting the bugs
     test closure.
 
0 Ravi
 
 
Answer
1.Test Statergies
2.Test Plan
3.Test Cases
4.Execution Test Cases
5.Bug Ananlysis
6.Reporting the Bug
7.Regression Testing

Vinodh Anandhan
Software Tester
Exceed Technologies (P) Ltd.,
Chennai
 
4 Vinodh Anandhan
 
 
Answer
STLC stands for Software Testing Life Cycle
It is a process of conducting sofware testing, means after 
programmer conducted intergration testing by using white 
box testing, the intergrated software build is coming to 
overall developed software testing.

The project manager is initiate the STLC processs
the phases of STLC
1. System test initiations
2. System test Planning
3. System test design
4. System test execution
5. System test Reporting
6. System test closure

explanation of STLC

1.System test initiations: in the the PM is initiates the 
whatever testing tools are available (either mannual or 
automation tools), with respect to specific custumet 
requirement 
2. test planning: schedule the which type of testing tools 
is allocate a specific tester to test the module in the 
developed project.(simply distribute the work to different 
testers based on their experience) and allocate the time to 
complete the work.
3. test design: means prepare test cases for each and every 
verified object are correctly working or not w.r.t customer 
requirement.
4.test execution: means the particular object is working or 
not as per customer requiremnt. means test is pass or fail 
or find any defect are informed to the development section 
for once again correct the coding part
5. System test preparing: after programmer correct the 
code, we can retest them 
6. test closure: after completion of all object test 
execution the PM is closed the test.
 
0 Biksham
 
 
Answer
1.requirements
2.use cases
3.test plan
4.test case
5.test case execution
6.report analysis
7.bug analysis
8.bug reporting

these steps are involved in software testing life cycle.

pardeep16d@gmail.com
 
0 Pardeep Kundu
 
 
Answer
Mr.rami reddy's answer is absolutley true. I ask you please 
follow that answer. Its in deatailed.

(software test engineer-II)
 
0 Sateesh
 
 
Answer
Stages of STLC :

1. Test Initiation or Test Planning :
Contents of Test Plan :
a) Scope of testing.
b) Functionalities to be tested and not to be tested.
c) Resource Planning, Scheduling.
d) Test Strategies, Test Deliverables, Test metrics
Defnition, defect metric definition.
e) Areas to be automated, and area not to be automated.
f) Evaluation of automated tools and selection of them.
g) Risk and contigency plans.

2. Test Design : Is nothing but preparation of test case
document.
Contents in Test Design :
a) Scope of test.
b) Test Scenario.
c) Test Procedure.
d) Test Cases.
e) Test data.

3. Test Execution : Execute the test cases and record actual
behaviour of the application.

4. Result Analysis : Compare Actual and Expected behaviour
of application if both are matched consider test case pass
otherwise test case is failed.

5. Bug Tracking : Consider all failed test cases as defects
and track them in a separate doc that is called as defect
profile doc.

6. Defect Reporting : Defect profile doc is send to PM and
Developer for the purpose of rectification.
 
0 Surii
 
 
Answer
1.	Test Requirements
2.	Test Planning
3.	Test Environment Setup
4.	Test Design
5.	Test Automation
6.	Test Execution
7.	Defect Tracking
8.	Test Reports and Acceptance
 
0 Vivek.Gupta
 
 
Answer
As the SDLC is "software Developement life Cycle" like that
STLC is the "Software testing life cycle" and this is
clearly mean to lifecycle which is totally based on the
testing of the Software.

I m giving a simple idea on it which will be very easy to
understand for everybody .
SDLC is mainly based on :-
 
Requirement analysis
function specification
testcase execution
Bug reporting
make ready for implementation

A)Requirement Analysis :-
Analyze the requirement ,and understand what is the main
Goal of the Project.

B)Functional specification :-
How can we get the right Output of fulfill the Outcome.

C)Testcase Execution :-
 on which way we can test this software to get the maximum
errors.

d)Bug report :-
 Report the error to the development team and also if you
have any idea/solution on the  error then you can also
suggest them.

E)Make Raddy to Implement:-
  this stage is for final implementation ,you have to make
conform whether is there any error exist or not.and also
mentioned this error is managable or may crash the system.
can we take the Risk here to deliver  the Product.
 
0 Sunil Kumar Sahoo
 
 
Answer
grammar should be check before you post it.
 
0 Messy
 
 
Answer
test plan: Road for entire testing activity.
test case:set of produre which we execute your find out defects.
test execution:running the test case,after approval the test
lead.fail/pass information stored in test log.
defect tracking:failed item carried to defect tracking.
reports:result analisys,test graphs preparation.
 
0 Prasanna
 
 
Answer
test plan:road map for entire testing activity
 
0 Prasanna
 
 
Answer
software testing life cycle. it's template
1. test plan
2. test design
3. test execution
4. track & management
planing done by manager
design done by developer
execution done by tester
 
0 Suman
 
 
Answer
STLC refers to Software Testing Life Cycle. This initiates 
from the Requirements phase and ends with closing the bugs.
Steps in STLC are
1)Requirements Gathering
2)Preparing the Test Strategy
3)Preparing the Test Plan
3)Preparing the Test Cases
4)Executing the test cases
5)Logging the Bugs in the Bug tracking tool
6)Retesting and closing the defects
7)Bugs maintainance.

The Difference between STLC and SDLC is when STLC includes 
all the testing activities SDLC includes both the testing 
and the development activities.
 
0 Lakshmi
 
 
Question   Identify the command to configure ALL the default VTY ports? A.) Router(config)# line vty 0 4 B.) Router# line vty 0 4 C.) Router(config)# line vty D.) Router(config)# line vty 0 Rank Answer Posted By  
 Interview Question Submitted By :: Guest
I also faced this Question!!   © ALL Interview .com
Answer
Answer: A
 
0 Guest
 
 
Answer
A.)Router(config)#line vty 0 4
 
0 Amol Chirutkar
 
 
Question   What is STP Reports Rank Answer Posted By  
 Interview Question Submitted By :: Guest
I also faced this Question!!   © ALL Interview .com
Answer
STP Reports are termed as Reports submitted to STP viz
Software Technology Parks of India. After getting registered
with STPI, Monthly/Quaterly/Yearly a Export Performance need
to be submitted. For more details visit to STPI site.
www.mumbai.stpi.in
 
0 Raju Patwardhan
 
 
 
Back to Questions Page
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com