Hi, all
suppose i have 5 steps (S1,S2,S3,S4,S5) what will happen if
cond is true or false (which of the other steps get executed)?
1) //s3 exec pgm=abc,cond=(0,le)
2) //s3 exec pgm=abc,cond=(0,le,step2)
3) In the jobcord RESTART=step3,cond=(0,le)
4) can i code COND=TRUE in jobcard, if yes what will happen?
If a job has 3 steps and step 1 and step 3 should get
executed and step 2 should not get executed irrespective of
the return code from the previous steps. How can it be done?
i have a ps with two columns eno and ename , i need to copy
eno column values in one ps and ename column values in one
Ps ? is it possible through iebgener . how ? thx in advance
I have a sequential file in which there are 50 records. Now
I want to copy all the 50 records in the reverse order into
a new file? The last record in the original file should be
the first record in the new file. How can I do it?
I have 5 steps in my job. say s1, s2, s3, s4, s5
//s1 exec .............
//s2 exec ............
//s3 exec ..........
//s4 exec ........
//s5 exec ...............
my question is i want to exeute only s2 and s4 steps...
please advice me how to do this:
Suppose i have 2 steps in my pgm. Step1- creates a file,
Step2 - generates report from file in step1, What changes
have to be made in Step2, so that if the file in Step1 is
empty Step2 should not be executed? No changes to be made to
Step1.