In material report output,if i click on any material i have to
open MM01 with that material in the field how?and from mm01
screen i have to come out what i have to do?
Suppose i have table with 2 columns say 1st with Numerics and
2nd with words like 1 for one and 2 for two......so.if i want
to change the 9 numeric word as some twenty...how?
I have 100 records and 75th record contains error,if i use
call transaction how many records will update the data base
and if i use session method how many will update?
We use ungrounded DC system (220V/110V) for control and
protection system in substations etc. Suppose we have long
2 core DC cables running from our DCDB in control room to
the load (length of around 2 to 3 km). Do we need to
protect these long DC cables from earth leakages or not? If
yes how?