how the CT and PT is connected in the circuit during testing of transformer explain with diagram
1486What is the maximum allowed kwa through 2.5mm cable. Electric company installed 2 electric meter at my premises . Two jumper wires of 2.5 mm are used to connect . 2 single phase meters with allowable load 6 and 3 kwa. These jumper wires are taken from a 3 phase electric meter. Meters are in open Sun. What max load these wires can take.
1654Post New KESC Interview Questions
How to write a minimum atom 1.0 feed file?
How do generics work?
How can get second highest salary in sql?
how a multiple routing works ?
How many joins in sql?
What are value tables?
What is ruby class?
Explain how does the vegetal stratification of an ecosystem influence the biological diversity?
How to generate create procedure script on an existing stored procedure?
Should I switch out of windows 10 s mode?
Explain TCP connection establishment and tear down?
What is a DStream?
Why do you need session handling while working with selenium?
What is sequelize?
is there in india the rate of work contract are same in all states if now what are the statewise rate