Is Test report same as Bug report....?
I have to give Test Report to the client for my Application
....and as it started all of sudden i did not make the test
cases and started of testing .....The bug Tracker where i
report the bugs has a facility to download the Bug reported
in word or in excel format....It has the detailed
description of "version" of appliation tested, whom assigned
.., resolved , closed..then the steps to reproduce the bug
and all...Is the documnet test report...
Hello friends..
Can anybody here explain me or provides me notes of these
topics in detail with interview questions...
Topics are:-
History of Software Engineering
Waterfall Model
Prototype Model
Spiral Model
Software Quality Testing
Software Development Life Cycle
Software Testing Life Cycle
white box testing methodology
black box
grey box
Definition of Quality,Quality Assurance,Quality Control
Verification and Validation
Static Testing
Dynamic Testing
only on my gmail mca.rachna21@gmail.com
Can someone give checklist to test the performance of
application. This checklist to be provided in the Test Plan
that the following will be tested, e.g.
1. n users will be tested to test the load
2. Per page load time would not be greater than n seconds
etc.
I want to know the points other than the above stated ones.
370
Does any one have Performance test plan and Security test plan?
Please help me as i need it ASAP...
Thanks in Advance.
326
write test case for ecomerce shopping
477
How To write Wimax field testing test cases,,,,? both
negitive and Positive,,,,follows rule Tringulation
(Logitude and latitude)
How do you document well a website (i.e an ONG website) pls
help me with a sample. Need your help UR
390
can we test the product with out documents?
70
An engineering college wants to automate their examination
activities to speed up their work and maintain high-end
accuracy of information. A brief overview of the proposed
system is given below:
The proposed examination system is consisting of 8
semesters spread across 9 branches (assume your own branch
names) and spans over a period of 4 years. Each student
belongs to a branch and must register for a minimum of 6
courses but not exceed 8 courses maximum. The scoring
pattern for each course is given as below:
Maximum marks for each course: 100
Pass: 35%
Distinction: 70% and above
First class: =>60% and <70%
Second class: >50% and <60%
Pass Class: >=35% and <50%
The proposed system computes the result and announces the
results every semester. The results must be accurate and
all examination records will be maintained till the
students leave the college.
Develop a Test Strategy to test the proposed system. Your
Test Strategy must include the following:
• Test Plan
• Testing Methodology to be followed
• Test cases
• Test effort estimation
• Test Correction Mechanism
Note: If you need more information on the requirement
specification, you are permitted to assume along the same
line but clearly specify the details.