rtos kernal have memory managament,sheduler and timer but
not haveing file system how vxworks allocate file table
process in memory? bud gpos have inside kernal
i created script for login in QTP,i parametirized that
using global sheet,problem i am facing is first i want to
login with first values provided in excelsheet and want to
perform some operation,second time if call same action it
should login with second values in excelsheet
we can use parameters in cl and rpg pgms...etc.in
particular i think when we use data area or datastructure
or data queue .i think this means which one====in my
question...parameters cannot be passed in which one????hope
understand my qstn???
How to check which are the pgms using 1 perticulate file.?
I know there is many tool available for X-reference...but
need to know is there any command available in the
system...?
I need to generate outfile for object of all the user lib.
in the sysmte using cmd DSPOBJD.
But this cmd is correcpted in my server,Any body tell me is
there any alternative...?
Q:HI friends accually ihave one problem plesase let me know
the alternate code of this code.
Related field description of code:
Add a field, CALvsPRD, "Calendar Day Starts Before/After
Production Day" to the parameter set WRKORDER which accepts
values 'A' or 'B'
o B = Calendar Day Starts Before Production Day
o A = Calendar Day Starts After Production Day
o Any other value indicates the production and
calendar dates are always the same.
code:
Automatic Execution Of *INZSR Subroutine
/Z01 * retrieves WRKORDER field values.
/Z01 * Calculate default Production Date and return it to
caller.
/Z01 * Production date defaults to system date
/Z01 C Eval P@Pdate = %DATE()
/Z01 * unless Calendar date starts Before PDN(production)
date and
/Z01 * system time is before PDN Start Time then
/Z01 * PDN date is yesterday.
/Z01 C If W@CALvsPRD = 'B'
and
/Z01 C %TIME() < %TIME
(W@Strtime)
/Z01 C Eval P@Pdate -= %Day(1)
/Z01 * unless Calendar date starts After PDN date and
/Z01 * system time is *GE PDN(production) Start Time then
/Z01 * PDN date is tomorrow.
/Z01 C ElseIf W@CALvsPRD = 'A' and
W@Strtime > *Zero and
/Z01 C %TIME() >= %TIME
(W@STrtime)
/Z01 C Eval P@Pdate += %Day(1)
/Z01 C
EndIf
/Z01 C Eval *InLr = *On
what is INFRASTRUCTURE MANAGEMENT and how it is related to
database,mainframes,java, overall how can u explain what it
is and how much it is useful for fresher in the company bec
iam selected for IM training?(basically iam java trained
candidate)