In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?
Describe the change process for material BOMs. Include
release procedure/status, notifications, responsibilities,
authorizations, involved systems, engineering change
management,revision levels, synchronization with current
production orders, other.
Describe the process for creating and adding to material
BOMs. Include release procedure/status, notifications,
responsibilities, authorizations, involved systems,
Engineering Change Management, and so on.
Do you need a complete history of your BOM changes? For what
reasons (documentation, different technical states in
operational areas, other)? For what types of BOMs? From what
point in time (initial released status, other)?
Do you use other validity types (such as serial number, time
period, or customer) in addition to the "Valid from" date to
control the validity of your BOM changes?
What change management functions do you require?
How do you want to define the validity of BOMs (based on
date/freely definable parameters)? Must existing change
histories be transferred to the R/3 System?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW
WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE.
I DONT HAVE A REALTIME EXPERIENCE THOUGH.
ITS MY FIRST TIME
Do you have products with a large number of variants? Do you
need Variant Configuration?
10
Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?
8
Do you use other validity types (such as serial number, time
period, or customer) in addition to the "Valid from" date to
control the validity of your BOM changes?
6
explain BOM usage and status?
14
Do you want to use one BOM to represent several similar
materials (closed variant BOM)?
11
what is varient BOM?
9
Hi All,
In Repititive manufacturing during backflush we enter the
production date and the batch. The classification for
production date and Shelf life expiration date has been
maintained in the material master.
We have a characteristic "date of last goods reciept"which
updates the characteristic value in the batch
classification automatically from the production date
entered in MFBF Tcode. Even though we have maintained the
min shelf life and total shelf life the system does not
calculate the remaining shelf life for the batch and does
not update the value for shelf life in batch classification.
Please suggest the procedure for updating values in batch
classification for shelf life automatically from MFBF
Regards,
LN
289
Do you use group BOMs for engineering/design and copy or
assign them to plants at implementation?
6
Describe the change process for material BOMs
5
What is Alternative BOM?
16
Describe the process for creating and adding to material
BOMs. Include release procedure/status, notifications,
responsibilities, authorizations, involved systems,
Engineering Change Management, and so on.
7
what is backflush? what are the benefits of back flush?
17
Do you have several alternative BOMs for a material,
depending on the manufacturing procedure or lot size, for
example (multiple BOM)?
7
What structure do your BOMs have? How many levels are there?
How many components are there on each level?
12
any one can provide me some sample resume for SAP PP with 0
to 1 year experience?
Describe the change process for material BOMs. Include
release procedure/status, notifications, responsibilities,
authorizations, involved systems, engineering change
management,revision levels, synchronization with current
production orders, other.
10
what does SAP business workflow do?
13
What change management functions do you require?
How do you want to define the validity of BOMs (based on
date/freely definable parameters)? Must existing change
histories be transferred to the R/3 System?
9
Do you need to use different BOMs for different
applications, such as Production, Engineering, Plant
Maintenance, and Costing (BOM usage)?