what is power factor? how can we correction the power factor
if this is high or low? If anyone know please please send
the answer on my email id ( kumarkirshan@in.com )
why we are caling 440 volt 3 phase supply instead of 660
volt 3 phase supply? because each phase as a voltage of 220
volt. if anybody know the answer for my question please
send it to my mail id. thank you.
WHAT IS THE FORMULA FOR CALCULATING CURRENT RATING(DIRECT
IN GROUND OR AIR) OF ARMOURED(XLPE) CABLE OF 4C,16Sqmm?
163
How to design harmonic filter at the project stage without
nowing the harmonics levels
191
HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST.
PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME.
I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE....
MY EMAIL ID IS nalla.amarnath@gmail.com
156
wht is the purpose of the earth electrode other then earthing
130
What is the maximum No. of out going mccbs permitted from
an LV distribution paqnel? What is the ampere relation
between incomer and out going switch gears/mccbs?
84
Refernce currents are to be generated using refernce
cueernts how can this be done
State the formula for overall efficiency of thermal power
station
218
TRAFO
1. WHY BREATHER IS USED.
2. WHY OIL GOES DOWN IN CONSERVATOR TANK.
3. WHY WE ARE TAKING OIL SAMPLE TAKING FROM BOTTOM OF
TRANSFORMER.
4. HOW TO CHECK IR VALUE OF TRANSFORMER.
5. WHY OLTC HAVING BUCHHOLZ TRIP ONLY; WHY NO ALARM.
6. OFF LOAD TAP CHANGER OPERATION PROCEDURE.
7. TR. SHUTDOWN / ISOLATION PROCEDURE.
8. WHEN THREE TRS. IN PARALLEL, ONE TR. IS NOT SHARING
THE LOAD – WHAT IS REASON AND WHAT YOU WILL DO.
9. WHY TR. HAS OLTC IN HV SIDE.
10. WHAT IS % IMPEDANCE.
11. WHY TR. RATING IN MVA.
12. WHAT IS VECTOR GROUP IN TR.
13. CONDITION FOR PARALLEL OPERATION OF TRS.
14. WHAT IS TERTIARY WINDING. WHERE IT WILL BE.
15. IF TR. TRIP ON BUCHHOLZ OR TAP CHANGER RELAY, WHAT
YOU WILL DO.
16. DIFFERENCE BETWEEN OIL TEMP. AND WINDING TEMP.
PROTECTION
17. HOW WINDING TEMP. IS MEASURED IN CAST RESIN TR.
18. DIFFERENT TYPES OF FAULTS IN TR.
Trafo - Page-1 of 2
19. WHAT HAPPENS WHEN TR. CHARGED FROM LV.
20. WHAT WILL YOU DO IF MEGGER READING SHOWS ZERO
BETWEEN LV WINDING AND EARTH.
21. CAN WE INTERCHANGE BUCHHOLZ RELAY OF MAIN TANK AND
OLTC TANK.
22. IF THE LINE BETWEEN BREATHER AND CONSERVATOR TANK
23. LOCKED, WHAT WILL HAPPEN DURING LOAD CYCLE.
24. WHAT IS THE FUNCTION OF OIL SEAL IN BREATHER.
25. WHAT ARE LOCATIONS FOR BUCHHOLZ RELAY FIXED IN
POWER TR.
26. WHAT ARE CHECKS IN POWER TR. DURING MAINTENANCE.
27. WHAT IS IMPORTANT WHEN WE CHECK OLTC OPERATION
DURING MAINTENANCE.
Trafo - Page 2 of 2
i have install 750 kva distribution transformer at my site and
want to do neutral earthing.
what calculations should i follow to determine earthing
conductor material and size?