I WANT TO LEARN TERA-DATA ,SO CAN ANY BODY PLZ REFER WHAT
ARE THE TOPICS I HAVE TO GO THROUGH, TO GET ASAP JOB ,SO
PLZ REFER ME WHERE I CAN GET NICE COACHING ON TERADATA.
Hello all,
Source Table(Flat File):- Target Table(Flat File):-
Date Date
01/08/2008(DD/MM/YYYY) 01/08/2008
02/08/2008
03/08/2008
04/08/2008
05/05/2008
My requiremnt is this. I need to do it by informatica,Plz
tell me how can i do it?
Thanks
HOW TO INTILIAZE ENVIRONMENT VARIABELS? & WHERE YOU WILL
GIVE VALUES FOR THESE VARIABELS?(I MEAN FOR PARAMETERS WE
WILL GIVE VALUES BEFORE RUNNING IN RUN WINDOW,THEN WHERE
YOU WIL GIVE VALUES TO E.VARAIABELS?)
Can the expiration parameter of 365 in the cognos 8
configuration
how to increase common symmetric key lifetime in days
123
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range: <min_lvl>”, where <min_lvl> is the value in the
min_lvl field.
My Question is how do you write the stage variable for
reject rows.
Describe what the SQL Server tempdb and tlog files are used
for?
143
How to create a new calendar in CMC? Can u please tell me
the process to create the required calendar.
Ex:- Year of that calendar to start with Jan-15 and ends
with Jan -30 and the Next month to start with Feb-31 and
ends with Feb-14.
89
tell me two or three issues from client side and how to
solve those issues?
please tell me any easy ways of testing the Data warehouse
project. In my project we are not using any tools for ETL.
we are writing scripts in SCRIPTELLA.
And we using Pentaho tool for Reporting
How can i test all these. please tell me ASAP.
thanks in adavance
235
Give a way in which u can implement a real time scenario
where data in a table is changing and u need to look up data
from it.How will u configure the look up transform for this
purpose?
77
what is hash file in abinitio? how will it read in
abinitio? in hash file the data files r combine
(file1.dat,file2.dat,file3.dat......etc) how will it divide?
pls help me out to find a projects for attending cognos
interviews
pls anybody send me projects with detail description to
explain at the interview time
pls send me real time project anybody
pls mail me at kittuchoudary2007@gmail.com